China 29m 33m Placing Radius Concrete Placing Boom with Hydraulic Jack-up System, Find details about China Tower Concrete Placing Boom, Self Jack-up Placing Boom from 29m 33m Placing Radius Concrete Placing Boom with Hydraulic Jack-up System
Model | Units | HGY32F | ||
Performance | Max.radius of placing boom | m | 32 | |
Freestanding height (to the joint between the end of the boom and swivel table) () | m | 22.7 | ||
Boom articulation | ° | 400 | ||
Slewing brake | / | always close | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total weight | kg | 24900 | ||
Counter weight | kg | 2900 | ||
Power | / | 380V/50HZ | ||
Motor | Model | / | Y2-160L-4 | |
Power | kW | 15 | ||
Hydraulic system | Pressure | MPa | 30 | |
Flux | l/min | 18 | ||
Hydraulic oil | Circumstance temperature 35ºC-50ºC35ºC-50ºC | / | L-HM 68 | |
Circumstance temperature 5ºC-35ºC5ºC- 35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC-15ºC-5ºC | / | L-HM 32 | ||
Control mode | / | Short-haul Control /radio remote control/ | ||
Pipeline cleaning | / | Wet cleaning/Dry cleaning / | ||
Structure of tower body | / | Tubular column | ||
Section of tower body | m×m | 0.75×0.75 | ||
Boom | Shape | / | Four hydraulic foldable arms R | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1st section | Length | m | 9 | |
Articulation | ° | 0°~82.5° | ||
2nd section | Length | m | 7.65 | |
Articulation | ° | 0°~180° | ||
3rd section | Length | m | 7.65 | |
Articulation | ° | 0°~180° | ||
4rd section | Length | m | 7.7 | |
Articulation | ° | 0°~180° | ||
Climbing | Climbing mode | / | By hydraulic cylinder climbing | |
Interval of climbing | m | 0.52 | ||
Floor frame | / | Hole prepared in floor | ||
Shaft frame | m | Hole prepared in floor 2.0~2.7 | ||
Min.Interval of climbing frame | Climbing | m | 3.0 | |
Placing concrete | m | 6.0 | ||
Rest | m | 6.0 |
Model | Units | HGY29C | ||
Performance | Max.radius of placing boom | m | 28.9 | |
Freestanding height (to the joint between the end of the boom and swivel table) () | m | 22.7 | ||
Boom articulation | ° | 400 | ||
Slewing brake | / | always close | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total weight | kg | 19100 | ||
Counter weight | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor | Model | / | Y2-160M-4 | |
Power | kW | 11 | ||
Hydraulic system | Pressure | MPa | 30 | |
Flux | l/min | 18 | ||
Hydraulic oil | Circumstance temperature 35ºC-50ºC35ºC-50ºC | / | L-HM 68 | |
Circumstance temperature 5ºC-35ºC5ºC- 35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC-15ºC-5ºC | / | L-HM 32 | ||
Control mode | / | Short-haul Control /radio remote control/ | ||
Pipeline cleaning | / | Wet cleaning/Dry cleaning / | ||
Structure of tower body | / | Tubular column | ||
Section of tower body | m×m | 0.75×0.75 | ||
Boom | Shape | / | Three hydraulic foldable arms R | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1st section | Length | m | 11.5 | |
Articulation | ° | 0°~82.5° | ||
2nd section | Length | m | 9.3 | |
Articulation | ° | 0°~180° | ||
3rd section | Length | m | 8.1 | |
Articulation | ° | 0°~180° | ||
Climbing | Climbing mode | / | By hydraulic cylinder climbing | |
Interval of climbing | m | 0.52 | ||
Floor frame | / | Hole prepared in floor | ||
Shaft frame | m | Hole prepared in floor 2.0~2.7 | ||
Min.Interval of climbing frame | Climbing | m | 3.0 | |
Placing concrete | m | 6.0 | ||
Rest | m | 6.0 |
Model | Units | HGY33E | ||
Performance | Max.radius of placing boom | m | 33 | |
Freestanding height (to the joint between the end of the boom and swivel table) () | m | 22.7 | ||
Boom articulation | ° | 400 | ||
Slewing brake | / | always close | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total weight | kg | 21200 | ||
Counter weight | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor | Model | / | Y2-160L-4 | |
Power | kW | 15 | ||
Hydraulic system | Pressure | MPa | 30 | |
Flux | l/min | 18 | ||
Hydraulic oil | Circumstance temperature 35ºC-50ºC35ºC-50ºC | / | L-HM 68 | |
Circumstance temperature 5ºC-35ºC5ºC- 35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC-15ºC-5ºC | / | L-HM 32 | ||
Control mode | / | Short-haul Control /radio remote control/ | ||
Pipeline cleaning | / | Wet cleaning/Dry cleaning / | ||
Structure of tower body | / | Tubular column | ||
Section of tower body | m×m | 0.75×0.75 | ||
Boom | Shape | / | Three hydraulic foldable arms R | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1st section | Length | m | 12.38 | |
Articulation | ° | 0°~82.5° | ||
2nd section | Length | m | 10.93 | |
Articulation | ° | 0°~180° | ||
3rd section | Length | m | 9.69 | |
Articulation | ° | 0°~180° | ||
Climbing | Climbing mode | / | By hydraulic cylinder climbing | |
Interval of climbing | m | 0.52 | ||
Floor frame | / | Hole prepared in floor | ||
Shaft frame | m | Hole prepared in floor 2.0~2.7 | ||
Min.Interval of climbing frame | Climbing | m | 3.0 | |
Placing concrete | m | 6.0 | ||
Rest | m | 6.0 |