Hot Selling Construction Hydraulic Jack up Concrete Placing Boom in China, Find details about China Concrete Placing Boom, Tower Jack up Concrete Placing Boom from Hot Selling Construction Hydraulic Jack up Concrete Placing Boom in China
Model | Units | HGY29C | ||
Performance | Max.radius of placing boom | m | 28.9 | |
Freestanding height (to the joint between the end of the boom and swivel table) | m | 22.7 | ||
Boom articulation | ° | 400 | ||
Slewing brake | / | always close | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total weight | kg | 19100 | ||
Counter weight | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor | Model | / | Y2-160M-4 | |
Power | kW | 11 | ||
Hydraulic system | Pressure | MPa | 30 | |
Flux | l/min | 18 | ||
Hydraulic oil | Circumstance temperature 35ºC-50ºC | / | L-HM 68 | |
Circumstance temperature 5ºC-35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
Control mode | / | Short-haul Control /radio remote control | ||
Pipeline cleaning | / | Wet cleaning/Dry cleaning | ||
Structure of tower body | / | Tubular column | ||
Section of tower body | m×m | 0.75×0.75 | ||
Boom | Shape | / | Three hydraulic foldable arms | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1st section | Length | m | 11.5 | |
Articulation | ° | 0°~82.5° | ||
2nd section | Length | m | 9.3 | |
Articulation | ° | 0°~180° | ||
3rd section | Length | m | 8.1 | |
Articulation | ° | 0°~180° | ||
Climbing | Climbing mode | / | By hydraulic cylinder climbing | |
Interval of climbing | m | 0.52 | ||
Floor frame | / | Hole prepared in floor | ||
Shaft frame | m | Hole prepared in floor 2.0~2.7 | ||
Min.Interval of climbing frame | Climbing | m | 3.0 | |
Placing concrete | m | 6.0 | ||
Rest | m | 6.0 |
Model | Units | HGY33E | ||
Performance | Max.radius of placing boom | m | 33 | |
Freestanding height (to the joint between the end of the boom and swivel table) | m | 22.7 | ||
Boom articulation | ° | 400 | ||
Slewing brake | / | always close | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total weight | kg | 21200 | ||
Counter weight | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor | Model | / | Y2-160L-4 | |
Power | kW | 15 | ||
Hydraulic system | Pressure | MPa | 30 | |
Flux | l/min | 18 | ||
Hydraulic oil | Circumstance temperature 35ºC-50ºC | / | L-HM 68 | |
Circumstance temperature 5ºC-35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
Control mode | / | Short-haul Control /radio remote control | ||
Pipeline cleaning | / | Wet cleaning/Dry cleaning | ||
Structure of tower body | / | Tubular column | ||
Section of tower body | m×m | 0.75×0.75 | ||
Boom | Shape | / | Three hydraulic foldable arms | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1st section | Length | m | 12.38 | |
Articulation | ° | 0°~82.5° | ||
2nd section | Length | m | 10.93 | |
Articulation | ° | 0°~180° | ||
3rd section | Length | m | 9.69 | |
Articulation | ° | 0°~180° | ||
Climbing | Climbing mode | / | By hydraulic cylinder climbing | |
Interval of climbing | m | 0.52 | ||
Floor frame | / | Hole prepared in floor | ||
Shaft frame | m | Hole prepared in floor 2.0~2.7 | ||
Min.Interval of climbing frame | Climbing | m | 3.0 | |
Placing concrete | m | 6.0 | ||
Rest | m | 6.0 |