Flexible Panel Strut for Wall Formwork During Erection
Combined with Plumbing strut and Adjusting strut, Panel struts are used to align and prop formwork panels, used with foot plate and connecting parts.
High push-pull load capacity
Standard connection with the wing nut and tie rod, no additional parts needed.
Flexible, but same connection to the steel waling on all HORIZON wall formwork panels.
With right-hand and left-hand turning spindle and revolving handle, it's easy and safe for aligning
and propping of wall formwork panels.
Panel struts are also use for horizontal support of formwork panels.
The panel strut enables the initial positioning of the formwork panels for strait and curved walls, for plumbing and bracing concrete wall forms, column forms, and many other construction applications where strong, rigid bracing elements are required.
It also provides stability until permanent structural connections are completed and lateral stability of the building or structure is established.
Wall Formwork Components:Components | Diagram / photo | Specification / description |
Wall formwork panel | | For all vertical formworks |
H20 Timber beam | | Water proof treated Height: 200mm Width: 80mm Length: as per table size |
Steel waling | | Painted, powder coated [12 steel channel |
Flange clamp | | Galvanized To connect steel waling and H20 beams |
Panel strut | | Painted |
Waling connector 80 | | Painted Used for formwork panels alignment |
Corner connector 60x60 | | Painted Used for forming inner corner formwork with wedge pins |
Top scaffold bracket | | Painted, severs as safety working platform |
Packing:1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.
Delivery:1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Who we are: HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.
What we offer: Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.
Why us: With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.
HORIZON FORMWORK, your reliable formwork partner!