China Buried Underground Distribution Transformer 315kVA 11kv 0.4kv, Find details about China Underground Transformer, Buried Transformer from Buried Underground Distribution Transformer 315kVA 11kv 0.4kv
Tech data of 10kV SZ11 series on-load regulation distribution transformer | |||||||||||
Rated capacity (KVA) | Voltage group (kV) | Vector group | Impedance voltage (%) | Loss(kW) | No-load current (%) | Weight(kg) | Outline dimension (mm) | Gauge vertical/ Horizontal | |||
No-loss | Load | Body | Oil | Total | |||||||
200 | (HV) 6-15kV (LV) 0.415-6kV | Yyno Dyn11 | 4 | 0.34 | 3.06 | 1.5 | 540 | 270 | 1110 | 1400*740*1190 | 550/550 |
250 | 0.4 | 3.6 | 1.4 | 640 | 290 | 1270 | 1420*790*1210 | 660/660 | |||
315 | 0.48 | 4.32 | 1.4 | 730 | 320 | 1500 | 1540*850*1240 | 660/660 | |||
400 | 0.57 | 5.22 | 1.3 | 940 | 370 | 1780 | 1590*940*1250 | 660/660 | |||
500 | 0.68 | 6.21 | 1.3 | 1040 | 370 | 1920 | 1650*1000*1350 | 660/660 | |||
630 | 4.5 | 0.81 | 7.65 | 1.1 | 1220 | 460 | 2280 | 1810*1140*1350 | 820/820 | ||
800 | 0.96 | 9.36 | 1 | 1500 | 500 | 2740 | 1890*1200*1310 | 820/820 | |||
1000 | 1.15 | 10.98 | 1 | 1610 | 520 | 3060 | 1910*1260*1570 | 820/820 | |||
1250 | 1.36 | 13.05 | 0.9 | 1880 | 700 | 3710 | 1960*1280*1740 | 820/820 | |||
1600 | 1.64 | 15.57 | 0.8 | 2290 | 780 | 4350 | 2330*1800*1910 | 820/820 | |||
2000 | 1.96 | 21.26 | 0.8 | 2560 | 900 | 4950 | 2580*1900*1950 | 820/820 | |||
2500 | 2.31 | 24.69 | 0.7 | 3170 | 1010 | 6020 | 2580*1940*2250 | 1070/1070 | |||
Note:it can supply voltage regulating range of ±4*2.5%for HV on load regulation transformers |
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testing. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months guarantee period normally. |