Factory Custom H20 Timber Beam Wall & Column Formwork System

China Factory Custom H20 Timber Beam Wall & Column Formwork System, Find details about China Zulin Steel Frame Formwork, Adjustable Steel Frame Formwork for Buliding from Factory Custom H20 Timber Beam Wall & Column Formwork System

Model NO.
H20 Timber Beam System Formwork
Usage
Outdoor
Trademark
LIANGGONG
Transport Package
Standard Package
Specification
Customized
Origin
China
Model NO.
H20 Timber Beam System Formwork
Usage
Outdoor
Trademark
LIANGGONG
Transport Package
Standard Package
Specification
Customized
Origin
China

Product Description


H20 Timber Beam Wall & Column Formwork


This system is considered using plywood fixed to H20 wooden girders, supported by steel walers and the associated accessories. This is the most common system used for column and wall production. Walkways and lifting brackets allow for good access and safe movement of panels throughout the site using tower cranes.

The basis of the H20 Wall & Column Formwork System is the H20 Timber Beam. The H20 Timber Beam is made of the highest quality with competitive advantages.

The H20 Timber Beam is sturdy, easy to handle and only weights 4.80 kg/m. It provides a high load-bearing capacity even for great distance of walers.

This advances results to less anchor points. The project oriented design and arrangements of the H20 Timber Beam elements allow choices of various types of the plywood sheet. Furthermore, the system allows an optimum and flexible arrangement of tie positions.

The H20 Wall & Column Formwork elements are assembled quickly and easily by connecting the H20 Timber Beams to the Walers by means of Timber Beam connector done as easily as the erection of the system.

The advantage is that the H20 Wall & Column Formwork and easy re-assembling when ground plans of the structure change frequently.


Products Show
Factory Custom H20 Timber Beam Wall & Column Formwork System
Factory Custom H20 Timber Beam Wall & Column Formwork System
 
Factory Custom H20 Timber Beam Wall & Column Formwork System
Factory Custom H20 Timber Beam Wall & Column Formwork System

Packing&Delivery
 
Packing
1.Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2.Different packages are used for different products: 
---bundles: Timber beam, steel props, tie rod, etc. 
---pallet: Small parts will be put in bags and then on pallets. 
---wooden cases: It is available on customer's request. 
---bulk: Some irregular goods will be loaded in bulk in container.
 

Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.


Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process

Factory Custom H20 Timber Beam Wall & Column Formwork System
Our Company


Lianggong Formwork Co., Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service. 

During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc. 

Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together. 
Factory Custom H20 Timber Beam Wall & Column Formwork System
Factory Custom H20 Timber Beam Wall & Column Formwork System
Factory Custom H20 Timber Beam Wall & Column Formwork System

Customer Photos
 
Factory Custom H20 Timber Beam Wall & Column Formwork System
Factory Custom H20 Timber Beam Wall & Column Formwork System

FAQ

Q1:Are you trading company or manufacturer?
A:We are factory.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
 A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
 A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

        If you have another question, please feel free to contact us !