Sprocket for Roller Conveyor System 08b

China Sprocket for Roller Conveyor System 08b, Find details about China Chain Wheel, Roller Conveyor from Sprocket for Roller Conveyor System 08b

Model NO.
08b
Trademark
GS
Specification
10Bb 20T
Origin
China
HS Code
8483900090
Model NO.
08b
Trademark
GS
Specification
10Bb 20T
Origin
China
HS Code
8483900090
Yuchen power tramsmission offer all the sprocket 
Product Description
1. American Standard, European Standard, Japanese Standard
2. Pilot bore, finished bore, taper bore and special bore available
3. Bright surface and high precision
4. Advanced heat treatment and surface treatment crafts
5. Better quality and competitive price.
6. Material C45(1045), low carbon steel, 40Cr, 20CrMnTi, stainless steel such as SS316L, SS316, SS304, SS420, copper etc. available
7. Standard sea worthy package to Europe and American
8. High speed digital gear hobbing machines to guarantee the teeths quality
9. Corrosion resistance treatment available
10. Control on tolerance and easy to install
11. Good material and good treatment to make sure long life span
12. OEM/ODM welcome
Product show

Sprocket for Roller Conveyor System 08b
  Sprocket for Roller Conveyor System 08b

   Sprocket for Roller Conveyor System 08b



Manufacture process
Business typeManufacturer & Exporter
Main export marketEurope, North and South America, Southeast Asia, Oceania, Middle East, Africa
MaterialC45, low carbon steel, 40Cr, cast iron, stainless steel, copper etc
Manufacturing methodForged and then machined, hobbed, if need can also weld
Heat treatmentHigh frequency quenching and so on
Surface treatmentOxide black, Galvanized, Nickel plated, Chrome plated, Sandblasting, Painted and so on
ModelType A & Type B, Single, Double, Triple - 35B10-80,40B9-90,50B9-90,60B9-90,80B9-90,100B9-90,120B9-80,140B10-60,160B10-60;06B10-125,08B9-125,10B9-125,12B9-125,16B9-125,20B9-114,24B9-90,28B9-76,32B9-76, and other sprocket to fit with conveyor chain, transmission chain
PackingPlywood Case/Pallet

   Sprocket for Roller Conveyor System 08b  Sprocket for Roller Conveyor System 08bSprocket for Roller Conveyor System 08b

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment 30%TT in advance. 70% T/T before shippment