China Russia Railway Bogie Frame for Railway Wagon, Find details about China Railway Part, Railway Wagon from Russia Railway Bogie Frame for Railway Wagon
Our Certifications and Features :
1.American "AAR" Certification;
2.Russian Certification;
3.Ukrainen Certification;
4. German "V" modeling technology;
Side frame - one of the main structural elements of the bogie framework of the model 18-100. It is manufactured by casting, with additional machining and riveting of wear-resistant plates. Side frame, drawing No.100.00.002-4SB, represents a major piece of a freight wagon bogie, which transmits the load on the axle through the axle box. Cast alloy steels 20GFL and 20GL.
Bolster drawing No.100.00.001-6 serves as a bridge between the two side frames in the construction of a freight wagon bogie.To ensure reliability and durability the bolster is casted from steel 20GFL or 20GL.One of the main frame details of a bogies framework model No.18-100. Set lifetime of a bogie frame before a bolster discarding is 30 years. The designated lifetime up to the first depot repair is 2 years, before the first overhaul is 8 years. Established time to failure is at least 2 years.
Overall dimension:
side frame:2.41m*680cm*56cm weight:400kg
bolster:2.61m*39.5cm*47cm weight:525kg
Forging Part | Train wagon bogie
|
Material | ER6,ER7,ER8,ER9,R7T,R8T,R9T,CL60 |
Dimension | According to your drawings |
Application | Heavy industrial equipment |
Inspection | Chemical composition; UT,MT; mechanical property; dimension check |
Standard | IRS,BS,UIC,AAR,BN,GB,TB/T,EN |
QC Doc | Chemical composition report mechanical properties report; UT test report; heat treatment report; dimensions check report. |
Forging Processing | Ingot---forging---heat-treatment---rough machining---UT.MT---Q+T---inspection---finishing machining---UT.MT---packing |
Heat Treatment | Normalized / Annealed / Quenched / tempered |