China Hotel Hospital Hot Water Boiler in Oman

China Hotel Hospital Hot Water Boiler in Oman, Find details about China Hot Water Boiler, Water Boiler from China Hotel Hospital Hot Water Boiler in Oman

Model NO.
WNS
Drum Placement
Horizontal Boiler
Pressure
Low Pressure
Manufacturing Level
A
Burning Style
Chamber Combustion Boiler
Usage
Industrial
Steam Capacity
700kw 1400kw 2800kw 4200kw to 29MW
Working Pressure
3-10 Bar
Burner
Euro-Imported Gas Burner or Oil Burner
Boiler Features
Wet Back, Three Pass Horizontal Packaged Boiler
Steam Temperature
95-115 Deg; C
Length
3.6-8.5meters Based on Capacity
Width
1.7-3.4meters Based on Capacity
Height
2-3.8meters Based on Capacity
Boiler Materials
Q245 Boiler Steel
Warranty Period
12 Months From The Date of Commissioning
Trademark
Yuanda Boiler
Transport Package
in Export Use Wooden Box
Specification
GB, SGS
Origin
Henan
HS Code
840219000
Model NO.
WNS
Drum Placement
Horizontal Boiler
Pressure
Low Pressure
Manufacturing Level
A
Burning Style
Chamber Combustion Boiler
Usage
Industrial
Steam Capacity
700kw 1400kw 2800kw 4200kw to 29MW
Working Pressure
3-10 Bar
Burner
Euro-Imported Gas Burner or Oil Burner
Boiler Features
Wet Back, Three Pass Horizontal Packaged Boiler
Steam Temperature
95-115 Deg; C
Length
3.6-8.5meters Based on Capacity
Width
1.7-3.4meters Based on Capacity
Height
2-3.8meters Based on Capacity
Boiler Materials
Q245 Boiler Steel
Warranty Period
12 Months From The Date of Commissioning
Trademark
Yuanda Boiler
Transport Package
in Export Use Wooden Box
Specification
GB, SGS
Origin
Henan
HS Code
840219000

China Hotel hospital hot water boiler in oman

  • capacityr: 350kw,700kw, 1400kw,2100kw,2800kw,3500kw,4200kw,5600kw,7000kw,10500kw, 14000kw
  • oil or gas fired
  • hot water output at 95 degree 
  • WNS Horizontal type, three pass 
  • used for greenhouse,central heating, hotel,laundry washing,school and so onChina Hotel Hospital Hot Water Boiler in Oman

WNS oil or gas HOT WATER BOILER Advantages:  

  1. Fully automatic operation
  2. Corrugated furnace design, large volume
  3. 3-pass boiler with spirally corrugated tube
  4. Fire tube type, Wet back structure, low maintenance cost.
  5. 20years life span without any problems
  6. With protective functions of over-temperature, overpressure, water shortage, leakage detection and flameout, ensuring safe and reliable operation. 

 

China Hotel Hospital Hot Water Boiler in Oman

WNS oil or gas hot water boiler Technical Parameters:
 

Boiler modelRated thermal powerWater pressure ratedRated outlet temperatureRated the return water temperatureFuel consumptionThermal efficiencyMain part weightMain part dimension
Light oil Heavy oil natural gasliquefied gas City gas 
MWMPaºCºCKg/hKg/hm3/hm3/hm3/h%tmm
WNS0.7-0.7/95/70-Y(Q)0.70.7957065.567.384.229176894.33561×1690×1910
WNS1.4-0.7/95/70-Y(Q)1.40.79570129.6132.216557.334689.274111×1950×2199
WNS2.8-0.7/95/70-Y(Q)2.80.79570256261.9323.610968289.29.54732×2150×2448
WNS4.2-0.7/95/70-Y(Q)4.20.79570380390.6450164102089.7165500×2600×2990
WNS5.6-1.0/95/70-Y(Q)5.619570503517642209132189.724.66450×2800×3200
WNS7-1.0/95/70-Y(Q)719570628643805264165490.326.26800×2900×3394
WNS10.5-1.0/95/70-Y(Q)10.5195709409651182400241790.8377150×3200×3540
WNS14-1.0/95/70-Y(Q)1419570125013011597520329991.2558200×3400×3826

 Supply Cope of Gas or oil fired Hot Water Boiler

Product name

Quantity (set)

1. Boiler main part

1

2. Imported gas/oil burner

1

3. Electric control box

1

4. Valve & Gauge used on boiler main part

1

5. Hot water distributor/header

1

6. Water pump

2

7. Smoke chimney

1

8. Water treatment equipment

1

The above is standard, other accessories are available, like condensed water recycling equipment, deaerator, pressure tank, etc.,

 China Hotel Hospital Hot Water Boiler in Oman

 

Packaging & Shipping, Trade Terms:

1. Way of delivery: by Sea or Railway or truck based on needs

2. Shipping model: by normal container and flat rack or bulk cargo based on goods, we can suggest the container

3. Customers specifying freight forwarders or we send bottom shipping price from our forwarder partner for your reference, negotiable shipping methods

4. Packing: nude for boiler main part in nude, accessories in export-use wooden box

5. Payment Terms: T/T, LC; 30% deposits; 70% balance before delivery.

China Hotel Hospital Hot Water Boiler in Oman

 

Company Information

Yuanda Boiler factory: established in 1956 with mature technology and experiences in boiler industry
China Hotel Hospital Hot Water Boiler in Oman

 

Our Services

Service --- Sincerity, Quality, Creditable

1.  Pre-sale services:

Act as a good adviser and assistant of clients, enable them to get rich and generous returns on their investments.  

1>. Select equipment model;  

2>. Design and manufacture products according to clients' special requirement;

3>. Train technical personnel for clients. 
2.  Services during the sale:

Respect clients, devote ourselves to improving the total value of clients.  

1>. Pre-check and accept products ahead of delivery;  

2>. Help clients to draft solving plans.  
3.  After-sale services:

Provide considerate services to minimize clients' worries.  

1>. Assist clients to prepare for the first construction scheme;  

2>. Install and debug the equipment;  

3>. Train the first-line operators;

4>. Examine the equipment;

5>. Take initiative to eliminate the troubles rapidly;

6>. Provide perfect service;

7>. Provide technical exchanging.

 
Welcome welcome to contact Mandy for more Information: