DIXIN glazed tile roll forming machine/roofing tile roll forming machine
DX1100-220-28 Glazed Tile Roll Forming Machine
Technical parameters:
1. Material spec: Colored steel sheet, galvanized steel sheet, aluminium sheet
2. Thickness of coil sheet: 0.3-0.8mm
3. Roller material: High grade NO. 45 forged steel, with hard chrome plating on the surface of roller with thickness 0.05mm
4. Shaft material: High grade NO. 45 carbon wrought steel
5. Cutting blade: Cr12 mould steel with quenched treatment
6. Diameter of shaft: 70-90mm
7. Thickness of medium plate: 14mm
8. Main frame: 300H/U steel
9. Number of forming steps: 15rows
10. Productivity: 6-10m/min
11. Main motor power: 4kw
12. Hydraulic station power: 4kw
13. Hydraulic pressure: 10-12MPa
14. Controlling system: PLC computer control
15. Voltage: 380V 3Phase 50Hz or at buyer's requirement
![Dixin Glazed Tile Roll Forming Machine/Roofing Tile Roll Forming Machine](//image.made-in-china.com/226f3j00HUwtANbEhDpl/Dixin-Glazed-Tile-Roll-Forming-Machine-Roofing-Tile-Roll-Forming-Machine.webp)
![Dixin Glazed Tile Roll Forming Machine/Roofing Tile Roll Forming Machine](//image.made-in-china.com/226f3j00PYmQwAqUCIpW/Dixin-Glazed-Tile-Roll-Forming-Machine-Roofing-Tile-Roll-Forming-Machine.webp)
![Dixin Glazed Tile Roll Forming Machine/Roofing Tile Roll Forming Machine](//image.made-in-china.com/226f3j00iGmaAQogJIrl/Dixin-Glazed-Tile-Roll-Forming-Machine-Roofing-Tile-Roll-Forming-Machine.webp)
The packing
Standard packing
Waterproof packageI
Iron wire will be needed to fix machines with containers.
Maintenance: Quite easy.
1 Equipment should always be wiped, keep clean, and not with muddy water.
2 Regularly feed lubricant to the machine gear, chain and moving parts to reduce friction and avoid rusting.
Service
1 One year warranty after delivery and lifelong technical support
2 If some parts of machines go wrong during this period,
DIXIN can offer our best,
But you should pay for seafreight or other fee.
3 on-site training available. Most of the time is not necessary.
The training period would be for no more than one week with the customer paying for the visa,
Return ticket, food, accommodations and a daily wage of USD 80
1 uncoiler and its base |
2 coil sheet guiding equipment |
3 roll forming system |
4 hydraulic pressing equipment |
5 post cutting equipment |
6 hydraulic station |
7 controlling system |
8 supporter table |