Product characteristics of molded septic tank
1, without leakage and leakage, eliminate two pollution
The tank body is made of FRP material molding technology with high strength and good sealing ability. It will never cause breakage caused by foundation settlement, and completely solves the problem of groundwater pollution in brick masonry tank. It ensured the reliable operation of septic tanks and the function of anaerobic bacteria. No smell, no germ overflow, no mosquitoes and flies, no pollution, fine workmanship, smooth inner wall, scientific diversion and no clogging.
2. Quick construction and convenient installation
The construction speed is fast, the day is installed, and the day is used. The foundation pit is excavated only according to the requirements. It can be put into use two hours after installation, so as to facilitate rush to rush the construction period and avoid the collapse of foundation pit due to time delay.
3. Never corroding and long service life
The products are resistant to humidity, oxidation resistance, acid and alkali resistance, high temperature and no deformation, and the service life can reach over the same period of service buildings.
4. Diversified products and flexible selection
The product specifications are complete and suitable for various process parameters such as the number of users. When the user's site is restricted, it can be arranged freely and arbitrarily according to the situation of the user's site.
How to install the SMC molded septic tank:
Excavation and treatment of foundation pit
The positioning and laying of SMC molded septic tanks should be determined according to the engineering design drawing, and the foundation pit can be excavated according to the size of the selected models. When the foundation pit is excavated to the predetermined elevation, the ground layer is rammed, the bearing capacity of the foundation is not lower than 1OOKN/, and the thick 500mm-1OOmm of yellow sand is used as the cushion, and the larger masonry or lump in the sand is removed and the lump is removed, and the holistic septic tank is ready to be installed.
Excavation installation:
When the SMC molded septic tank is assembled or has groundwater and the soil is very poor, the thick 1OOmm pebbles or crushed stone should be rammed, the 1OOmm-300mmC1O grade concrete cushion is set on the base, the concrete cushion is covered with 1OOmm sand cushion, and the two sides of the tank are filled with plain soil.
Our companyZLRC covers all products related to environmental protection equipment, FRP/GRP pipe, FRP tank, FRP septic tank, FRP air scrubber, waste air treatment system, waste water treatment system, and FRP filament winding machine, FRP tank panel press machine, FRP grating machine, FRP pultrusion profile production line, FRP SMC sheet raw materials production line and other raw materials , mechanical equipment, etc. We supply complete solutions and services including: 1) design and manufacture 2) installation and contraction 3) guide and training 4) know-how and technical support. ZLRC insists on using advanced technologies to improve the quality of products. Meantime, we take into consideration of various specifications and standards concerning the local and international market needs. Relying on complete R&D facilities and efficient technical team, we have had ability to produce all kinds of FRP products with high quality. We have been the leading company in China. Now we are devoted to increasing technical level of products to be in conjunction to the worldwide needs. At the same time, we supply complete after-sale service and technical support. We are sincerely seeking any chance to cooperate with international customers with different ways, preferring international agency and Customer Service
1. Reply your inquiry in 24 working hours.
2. Experienced staffs answer all your requestions in fluent English.
Technical support
1. Customized design is available.
2. Exclusive and unique solution can be provided to our customer by our well-trained and professional Engineers and staffs.
3. Talented technical team will try their best to solve any difficult flue gas treatment proposes and special orders.
After sale service
1. During 1 year guarantee period, our engineers are available if there is something wrong with equipment.
2. when installation, engineers will guide field officers to prove the correct installation.