The multi-plate screw press, which in controlled by the electric control cabinet,
allows automatic continuous operation of sludge flocculation, thickening, dewatering and the filtrate discharging.
Suitable for sludge dewatering of various industrial waste water.
1. Dosing tank 2. dewatering part 3. thickening part
4. electric control cabinet 5.mixer 6. motor 7. Reducer 8. dry sludge out
Due to the movement of fixed rings and moving rings, multi-plate Screw Press allows continuous operation in 24 hours with no blocking.
It is especially good at dealing oily sludge. Moreover, it doesn't need additional water to clean the equipment , so that there is no secondary pollution.
Model | Dimensions(L*W*H mm) | Power(kw) | Weight(kg) |
BEA-131 | 1816*750*1040 | 0.35 | 194 |
BEA-132 | 2065*900*1040 | 0.45 | 275 |
BEA-201 | 2500*680*1450 | 0.74 | 380 |
BEA-202 | 2500*930*1450 | 1.1 | 470 |
BEA-301 | 3200*970*1790 | 0.92 | 820 |
BEA-302 | 3600*1200*1790 | 1.65 | 1350 |
BEA-303 | 3850*1600*1790 | 2.2 | 1820 |
BEA-351 | 4000*750*2000 | 1.3 | 950 |
BEA-352 | 4200*1200*2000 | 2.25 | 1300 |
BEA-353 | 4350*1700*2000 | 3.35 | 1680 |
BEA-401 | 4200*850*2100 | 2.05 | 1270 |
BEA-402 | 4350*1450*2100 | 3.75 | 2350 |
BEA-403 | 4500*2050*1960 | 5.6 | 3870 |
BEA-404 | 4600*2250*1960 | 8.2 | 5230 |
Features
1. Automatic continuous operation
2. Compact design with flocculation and dewatering
3. Low power and water consumption
4. Low operation cost
5. No filter cloth, no clogging
6. No need for sludge thickener
7. Easy operation and maintenance
8. No vibration and noise
Technical Support:
1)English manual book
2) Technical drawing
3)Experienced engineers guide
4)Product warranty: Usually, our product warranty is 18 months after leaving factory or 12 months after installation.
5)Installation: If the project needs our installation guidance, we can send our engineer and translator.
FAQ
Q: How to buy your product?
A: You can provide us the waste kind and waste quantity(connect us for more details). we will recommend you the suitable product.
Q: How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
Q: What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 3 to 4 weeks.
Q: How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. And we will send a technician to guide for installation and debugging. After
debugging equipment, he will teach your workers how to use it and how to maintain it.
Q: How to visit your factory?
A: You could fly to Qingdao airport and we will pick up you to our company.