China C75s Cold Rolled Tempered Spring Steel Strip, Find details about China Steel Strips, Factory from C75s Cold Rolled Tempered Spring Steel Strip
Product Description |
Product Name | c75s cold rolled tempered spring steel strip | |||||
Material | CK67/CK75/C67S/C75S/C67/C75/SK5/51Crv4/75Cr1/75Ni8.etc | |||||
Color | blue polished,polished-bright,white,blue,yellow.etc | |||||
Techinique | cold rolled,annealed,heat treatment with hardened and tempered | |||||
Hardness | 44-48hrc | |||||
Edge | Rounded,Slitted | |||||
Application | band spring,rolling door spring,rolling shutter spring,rolling shuter accessories | |||||
package | each bundle with light oil and plastic film then wrapped in anti-rust paper with metallic pallet | |||||
The Regular size the clients request | ||||||
16 x 0.56 | 16x0.6 | 20x0.6 | 25x 0.6 | 20 x 0.7 | 25 x 0.7 | 20 x 0.8 |
25 x 0.8 | 30 x 0.7 | 35 x 0.8 | 32 x 0.7 | 40 x 0.8 | 40x 0.9 | 40 x 1.0 |
40x 1.1 | 50x 1.0 | 60x1.0 | 60 x 1.1 | 100 x 1.2 | 120x1.2 | 125 x 1.25 |
50 x 1.0 | 152.4x 1.2 | 177.8 x 1.47 | 203.2x 1.47 | 127 x 1.47 | 203.2 x 1..65 | 228.6x1.63 |
Production Show |
Application band saw blade,saw blade.etc |
Production Show From first-rate raw material, cold rolling, quenching and tempering process, de-burring edges, etc, each production step, is checked carefully in width, thickness, hardness, edge as flexibility, toughness.etc |
Our factory our factory is a leading supplier high carbon steel strip,alloy steel strip and stainless steel strip in two heat treatment ways - hardening & tempering conditions and cold rolled annealing conditions.Occupying 25,000 square meters manufacturing area |
Our Team |
Inspection(only after all the goods pass the QC that can be delivery) |
Package&Delivery Packing Details : each coils with light oil and plastic film then wrapped in anti-rust paper with metallic pallet Delivery Details : 25-30days after the order confirmed |
Our Certifications |
Customer Visit |
FAQ Q: Are you trading company or manufacturer ? A: We are factory Q: How long is your delivery time? A: Generally it is 25-30days after the order confirmed Q: Do you provide samples ? is it free or extra ? A: Yes, we could offer the sample for free charge but do not pay the cost of freight. Q: What is your terms of payment ? A: T/T, L/C,D/P..etc If you have another question, pls feel free to contact us |