Good Quality Carbonated Soft Drink Bottling Line

China Good Quality Carbonated Soft Drink Bottling Line, Find details about China Soft Drink Bottling, Drink Filling Machine from Good Quality Carbonated Soft Drink Bottling Line

Model NO.
DCGF24-24-8
Power
by Order
Certificate
ISO9001
Status
New
Quality
High
Trademark
Beyond
Transport Package
International Standard Export Package
Specification
ISO9001
Origin
Zhangjiagang China(Mainland)
HS Code
8422303090
Model NO.
DCGF24-24-8
Power
by Order
Certificate
ISO9001
Status
New
Quality
High
Trademark
Beyond
Transport Package
International Standard Export Package
Specification
ISO9001
Origin
Zhangjiagang China(Mainland)
HS Code
8422303090
Good Quality Carbonated Soft Drink Bottling Line
Good Quality Carbonated Soft Drink Bottling Line

1. The series equipment is used in production gas containing water of PET polyester bottle-packing carbonated beverage, such as drink etc.

2. It carries out washing bottle, filling and capping on one machine.

3. The whole machine designing is reasonable.

4. The appearance is beautiful and the maintenance is convenient.

5. It adopts bottle handing technology to make changing bottle more convenient, faster and easier.

6. The main machine adopts advanced PLC control, touch screen and no-bottle, no-cap system.

7. The key electric elements are from famous international brand.
ModelDCGF
16126
DCGF
18186
DCGF
24248
DCGF
32328
DCGF
404010
DCGF
484812
DCGF
606015
DCGF
808020
Heads of washing, filling, sealing16-12-618-18-624-24-832-32-840-40-1048-48-1260-60-1580-80-20
Production capacity(bottle/hour)3000-40005000-
7000
8000-1200012000-1500016000-1800020000-2400024000-2800036000-40000
Suitable bottle heightH=170-320Φ=50-100
(330-1500ml)
      
Spraying pressure0.25-0.3
Total Power1.5+0.372.2+0.373+0.45+
0.25
5.57.5111519
Overall dimension(L×W×H)
 
2300×
1680×
2650
2500×
1760×
2650
3100×
2100×
2650
3800×
2800×
2650
4000×
3300×
3400
4850×
3650×
3300
6500×
5400×
3500
7650×
6400×
2700
Weight26003500465068008500100001250016000

Good Quality Carbonated Soft Drink Bottling LineGood Quality Carbonated Soft Drink Bottling LineGood Quality Carbonated Soft Drink Bottling LineGood Quality Carbonated Soft Drink Bottling Line
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
 

 
Good Quality Carbonated Soft Drink Bottling Line
Good Quality Carbonated Soft Drink Bottling Line