China Steel Structure Construction Prefab Steel Structure Wedding Hall Quotation, Find details about China Prefabricated Building, Steel Building Kit from Steel Structure Construction Prefab Steel Structure Wedding Hall Quotation
Steel Structure Building Factory Constructor Builder In China
Description
Steel structure workshop included the main structure (steel beam/girder, steel column/pillar), the secondary structure( roof and wall purlin, steel bracing, tie-bar etc), door and windows, and other accessories.
Contact Me For More Photos Free Design And Best Price
Choose Xinmao,Choose Right
Application
Inidustry: Wokeshop, warehouse, and other industry facilities.
Commerce: Mall, hotel, exhibition hall, office building.
Public: School, library, sports stadium, churce, etc.
Learn More Specification
| Item Name | Specification |
Main Steel Frame | Steel Column | Q235B, Q345B : H shape, Box, Steel pipe, Hot rolled sheet |
Steel Beam | Q235B, Q345B : H shape, Steel Truss, Hot rolled sheet | |
Supporting System | Brace | Q235B, Q345B : Steel rod, Steel pipe, Angle steel |
Roof Purlin | C or Z shape, Steel purlin | |
Wall Purlin | Q235B, Q346B: C or Z shape, Steel purlin | |
Roof | Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool | |
Wall | Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool | |
Accessories | Bolts | Ordinary, High strength |
Gutter | Galvanized Steel plate, Stainless steel | |
Windows | Aluminum alloy-Glass, Aluminum alloy-shutter, PVC | |
Doors | Sliding or Rolling door | |
Downpipes | PVC pipe, Color steel pipe | |
Edge Cover | Made of color steel sheet thickness 0.5mm | |
Ventilator | Stainless steel | |
Crane | Crane in 5 tons to 20 tons |
Good Materials Make Good Quality
Steel Structure Process:
1. Prepare raw materials : cut steel plate or use internation size H section steel and angle steel, round tube, round steel, square tube etc.;
2. Assembly and welding: our welders will follow the drawings to assemble the steel members and weld them together as a entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding, this is the first quality check)
3. Sand blast : After finish welding and polishing, our sand blast effect can reach internation 2.5 high grade, very good for resist rust; (Secondary quality check)
4.Paint : Within 2 hours after sand blast, all the steel members should be paint. Client can choose any color and any brand of paint. (The third quality check)
5. Inspect the goods by client : After we finish a part of fabrication work, we will invite clients to check the goods before we pack the steel frame.
6.Packing and loading : If clients require us to load the goods by close containers, we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )
Packing And Delivery
Load to a steel pallet for easy loading and unloading ,meanwhile protect the goods from damaging .
Main steel frame without packing load in 40' OT, roof and wall panel load in 40' HQ! Or according to customer's requirement
Installation
We provides customers with one-stop integrated housing solution including installation and operation.
Engineers and workers can be sent abroad for guidance and installation.
Buyers Feedback
Certification
A. ISO Certificate for quality, environmental,occupational health and safety
B.Steel Structure Construction Qualification Certificate Grade II.
C. SGS certification
Why Choose Qingdao Xinmao ZT
1. Long History and Rich Experience in Steel Structure
A. 15 + years Industry Experience.
2. Advanced Equipment and Professional Production Line
A. 50,000 square meters Factory area
3.High Production Capacity
A.50000 Tons Steel Structure Annual Capacity
4. Best Quality Gurantee
A. Advanced preservative treatment
Warranty period: 18-20 years under normal conditions.
b. Hot-dipped galvanized, if the thickness of parts is less than 5mm,thickness of hot-dipped gal is more than 65um; when equal to or more than 5mm, that is more than 86um.
Warranty period: 45-50 years under normal conditions
.
Our Services
1.Installation introduction / CD / installation drawing will be provided if needed.
2.Engineers and workers can be sent abroad for guidance and installation.
If you want free design, pls supply us the following parameter
A.Location: ______(country)
B.Dimension:Length______m*width______m* eave height ______m
C. Earthquake load ______ Snow load ______ (KG/M2) Wind load ______ (KG/M2)
D. Demands for doors and windowsE. Claddings: wall material? Insulation?
F. Sunlight panel on the roof?
G. Ventilator on the roof?
H. Gutter: yes or no?
I. Crane: yes or no? If yes, _____units, lifting weight ____T, and lifting height______mm
J. The function of building, the interior equipmet
Please Contact Me For Free Design And Best Price
Steel Structure House, Building Material,Prefabricated House,Steel Products,Steel Structure Materials, Steel Structure Parts,Steel Structure Frame Factory Steel Structure Construction ,Steel Frame Structure,Structural Steel, Iron And Steel Company From China
Structural Steel Fabrication,Prefab House,Building Material,Prefabricated Building,Factory Building Rent,Nigeria House Steel Structure Structural Steel Fabrication with Free Autocad Drawings