China Big Size and Heavy Wall Hot Rolled mm Seamless Pipe (S275, S355, Q235, A106, A53, CK22), Find details about China Hot Rolled Seamless Steel Pipe, Big Size Steel Pipe from Big Size and Heavy Wall Hot Rolled mm Seamless Pipe (S275, S355, Q235, A106, A53, CK22)
Hot rolled seamless steel pipe
1.Standard:GB/T8162 ASTM A106 JIS G3441 JIS G3444 JIS G3445 API 5L API 5CT
2.Production method:hot rolled
3.Scope:Out diameter:32-426mm Wall thickness:8-70mm
4.Tolerance:OD:+/-1% WT:+/-12.5%
5.Material:C10E C20E C40E C45E CK22 CK30 CK35 40Mn4 SMn420 30Mn5 36Mn5 20Cr4 41Cr4 15CrMo5 20CrMo5 25CrMo4 42CrMo4 and so on
6.Delivery conditions:hot rolled, normalizing
7.MOQ:10metric ton
8.Packing:bundles with steel strip
9.Shipment ways:(1)bulk carrier,if large,suggest choose bulk carrier because port surcharge is lower than container
(2)20'container:22metric ton
40'container:26metric ton
Product Name | HRC S275 S275JR S355JR SS400 carbon steel pipe corten ms steel pipe | |
Size | OD | 3/4"--48 |
Thickness | 3mm-45mm | |
Length | SRL,DRL,5.8M,11.8M | |
Steel Material | ASTM A53/A106,API 5L,EN10216,DN162ASTM A179 A192 A210 | |
Steel Grade | Grade A,Grade B,Grade C,X42,X52.S235JRH,S355,P265 ect. | |
Process | Hot rolled/hot expansion/cold drawn/cold rolled | |
Usage | High temperature service | |
Surface | Bared Black Painting, Galvanized,Coating | |
Proctor | Plastic cap | |
Package | Bundles, Bulk | |
Inspection | With Hydraulic Testing, Ultrasonic testing or X-ray Test | |
Certificate | API | |
Date of Delivery | Less Than 15/20/25/30/40/50/60 Days According To The Quantity | |
Payment: | L/C or T/T | |
Port of Shipment | Xingang,China |
Packaging & Delivery | |||
Packaging Details | |||
Packing Details : Export standard package,bundled or be required. | |||
The inner size of container is below: | |||
20ft GP: 5.8m(length) x 2.13m(width) x 2.18m(high) | |||
40ft GP: 11.8m(length) x 2.13m(width) x 2.18m(high) | |||
40ft HG: 11.8m(length) x 2.13m(width) x 2.72m(high) | |||
or by bulk carrier | |||
Delivery Time | |||
15-30 days after receiving the advanced payment |