Hot DIP Galvanized Steel Ringlock Scaffolding System for High Rise Building

China Hot DIP Galvanized Steel Ringlock Scaffolding System for High Rise Building, Find details about China Scaffold, Falsework from Hot DIP Galvanized Steel Ringlock Scaffolding System for High Rise Building

Model NO.
ZL-RS054
Trademark
CHICO
Specification
ZL-RS054
Origin
China
HS Code
7308400000
Model NO.
ZL-RS054
Trademark
CHICO
Specification
ZL-RS054
Origin
China
HS Code
7308400000

steel ringlock scaffolding system for high rise building

Ringlock scaffolding system  is the type for civil works, infrastructure. It's compatible with various formwork types (traditional formwork, formwork system or steel panels) for a consummate design.

 

Features:

(1).All components have excellent structural strength,Verticals assembled with horizontals and diagonals can form excellent combination.

(2).Simple and rapid assembly can save lots of time and labor costes.

(3).All components are made of high tensile steel with hot dip galvanized finish for long life.

(4).Ringlock scaffolding system can be used in different terrains and buildings

(5).It is compatible with various formwork system for a consummate design.

(6).It is widely used in buildings, bridges, tunnels etc constructions.

(7).Individual components can be packed in bundles for easy storage and transportation.

 

Ringlock standard/verticals sizes:

Item CodeLengthWeight(kgs)Weight(lbs)
ZRS0500.5M1'8"3.19 7.01 
ZRS1001M3'3"5.66 12.45 
ZRS1501.5M4'11"8.07 17.75 
ZRS2002M6'7"10.45 23.00 
ZRS2502.5M8'2"12.87 28.32 
ZRS3003M9'10"15.29 33.64 
ZRS4004M13'1"20.11 44.24 

 

Ringlock ledger sizes: 

Item CodeLengthWeight(kg)Weight(lbs)
ZRL0650.65 M 2'2"3.14 6.91 
ZRL0880.88 M2'10"3.93 8.65 
ZRL0920.92 M 3'4.09 9.01 
ZRL1071.07 M3'6"4.68 10.29 
ZRL1151.15 M3'10"4.95 10.88 
ZRL1571.57 M5'2"6.47 14.23 
ZRL1831.83 M6'7.40 16.28 
ZRL2132.13 M7'8.49 18.68 
ZRL2442.44 M8'9.61 21.15 
ZRL3053.05 M10'11.83 26.02 

Hot DIP Galvanized Steel Ringlock Scaffolding System for High Rise BuildingHot DIP Galvanized Steel Ringlock Scaffolding System for High Rise BuildingHot DIP Galvanized Steel Ringlock Scaffolding System for High Rise BuildingHot DIP Galvanized Steel Ringlock Scaffolding System for High Rise Building


Hot DIP Galvanized Steel Ringlock Scaffolding System for High Rise BuildingHot DIP Galvanized Steel Ringlock Scaffolding System for High Rise BuildingHot DIP Galvanized Steel Ringlock Scaffolding System for High Rise Building

We Specialized in the manufacturing of Scaffolding,Scaffolding accessories, steel tubes,Scaffolding casting components etc.

Our own brand "Crosslock system scaffolding" are widely used in the Bridges,Buildings,Tunnel etc Civil construction project.

Our factory got many national patents for invention, won the title of national High-tech enterprise.

As an professional supplier, we devote to the research, performance testing and production process improvement in scaffolding system.factory covers an area of 19,972 square meters, workshop over 15,000 square meters, Our monthly outputs can up to 5,000 Tons. In addition,we got the high automatic production line and the whole process information system control to ensure the excellent quality. With the skilled staff, strict quality control and advanced machines, we have passed the I S O 9 0 0 1, I S O 1 4 0 0 1 and O H S A S 1 8 0 0 1 certificates.

We are committed to continuously providing quality products and the best services according to the international standards.Warmly welcome to visit our factory. With you, we will go further.

FAQ

Q 1, Are you a factory or a trading company?

        Yes,We are professional factory.

 

Q 2.Do you have strong techinicans teams?

       Yes,we have 8 experienced techinicians and got much experiences in civil engineering project.

 

Q 3. Do you accept OEM services?

        Yes, we could make the customized products according to your drawings.

 

Q 4. What is your production capacity?

        3000Tons per month.

 

Q 5. Do you have test report?

   Yes, we have done many test in Famous university--Hefei University of Technology.

 

Q 6. How long is your delivery.

      Usually 20-25days after deposit confirmed.