China 0563 0002 Testo Smart Probes Refrigeration Set 2X Testo 115I Clamp Thermometer and 2X Testo 549I Pressure Measuring Instrument, Find details about China 0563 0002, 0563 0002 Testo Smart Probes Refrigeration Set from 0563 0002 Testo Smart Probes Refrigeration Set 2X Testo 115I Clamp Thermometer and 2X Testo 549I Pressure Measuring Instrument
Low refrigerant loss thanks to hose-free application
Quick and easy installation directly at the pressure connection
Easy refrigerant selection
Automatic calculation of the evaporation and condensation temperature via testo Smart Probes App
The testo Smart Probes Refrigeration set is ideal for carrying out servicing and troubleshooting on air conditioning and refrigeration systems, as well as for installing them. The robust testo Smart Case enables the measuring instruments to be conveniently transported and ensures that they are always to hand when needed.
Product Description
Temperature - NTC | |
---|---|
Measuring range | -40 to +150 °C |
Accuracy | ±1.3 °C (-20 to +85 °C) |
Resolution | 0.1 °C |
Pressure measurement | |
---|---|
Measuring range | -1 to +60 bar |
Accuracy | ±0.5 |
Resolution | 0.01 bar |
Probe connection | 7 / 16 " - UNF |
Overload rel. (high pressure) | +65 bar |
General technical data | |
---|---|
Dimensions | 183 x 90 x 30 (testo 115i) 125 x 32 x 31 (testo 549i) |
Operating temperature | -20 to +50 °C |
System requirements | requires iOS 8.3 or newer; requires Android 4.3 or newer; requires mobile end device with Bluetooth 4.0 |
Battery type | 3 AAA micro batteries |
Battery life | 150 h (testo 115i); 250 h (testo 549i) |
Pressure media | CFC, HFC, HCFC, N, H2O, CO2 |
Storage temperature | -20 to +60 °C |
1. Where is your company?
we are located in Guangzhou, the capital city of Guangdong Province, near to Shenzhen, Foshan & Hong Kong, very convenient for shipping.
2. How about the MOQ?
1 unit is ok.
3. Shipping methods and lead time?
By Express: 5-7 working days to your door (DHL, UPS, TNT, FedEx...).
By Air: 7-10 working days to your airport.
By Sea: Pls advise your port of destination, the exact days will be confirmed by our forwarders, and the following lead time is for your reference.Europe and America (25 - 35 days), Asia (3-7 days), Australia ( 16-23 days).
4. What is the term of Payment?
T/T, L/C,Western Union, Paypal;
30% T/T in advance,70% before delivery.
5. What are your main products?
Compressor;
Refrigeration gas;
Refrigeration spare parts ;
Cold room panels and equipments .
6. Packaging & Shipping:
Packing: wooden pallet, wooden case or with outer carton, or as per customers' specific requirements.