China Professional High-Rise Building Construction Climbing Scaffolding, Find details about China Climbing Scaffolding, Construction Climbing Scaffolding from Professional High-Rise Building Construction Climbing Scaffolding
Name | Unit | Standard value | Note. |
Frame height | \ | 4-5 level of the floor | \ |
Frame width | m | 0.6-1.2 | Distance with the mainframe support and the building |
Support span | m | ≤6.0 | Curve or broken distance≤5.4 |
Length of cantilever | m | <2m,And shall not be more than 1/2 support span | / |
Average space between each hoist position | m | 4~5 | / |
The vertical spacing of the frame | m | 2 | / |
Anti-fall device | / | No less than one in any condition | The 24/7 process works with the concept of non-falling |
The minimum frame distance to the wall | mm | ≤200 | / |
Frame weight | t/m | 0.6-0.7 tons per extension meter | Each extension meter along the horizontal peri-perith |
The rate of the electric hoist | t | 7.5 | / |
Climbing speed | mm/min | 120-130 | / |
Electric hoist motor power | Kw | 0.5 | Single motor power |
Time for raise a floor | h | Normally 0.5 | Each set |
The lift control of the frame | / | Remote control | One main control, and hand on per person |
The frame simultaneously lifts the load control | / | Over or less than 30% of the fault point,it will alarm and an automatic shutdown | / |
Deviation allow for the pre-buried hold | mm | ±50 | / |
The carrying capacity of the operating layer | KN/square metre | Two simultaneous: 3.0; Three simultaneous: 2.0 | / |