China High Rise Building Construction Scaffolding Multi Function Operation Frame, Find details about China Scaffolding, Supportive from High Rise Building Construction Scaffolding Multi Function Operation Frame
Multi-function Operation Frame for High-rise Building Concrete Construction
Product description
Multi-function operation frame is widely applied in reinforcement installation, formwork erect and dismantle, concrete surface repair etc. Combination with modular standard parts, Various frame unit could be assembled to meet site requirement.Integrited with steel decking and ladders,The frame can be moved with attachable wheel or lifted by crane rapidly. Multi-function operation frame is an idea option for jobsite daily work, it fully solved low efficiency caused by frequently scaffolding erection and dismantle and optimize construction process and reduce the labour costs
Component
• Basic frame
• Horizontal bar
• Side guarding rail
• Adjustable foot jack
• Riffled steel decking
• Adjustable supporting prop
Technical parameter
• Unit Standard dimension (LxHxW) 4.5mx5.33mx0.85m
• Level of platform 3 level
• Load capacity 25kN/m2
• Surface treatment: hot galvanize
Company Profile
ForPro Formwork Technology Co.,Ltd is a professional formwork company concentrating on formwork R&D, design, manufacture and selling.
Our products are large size panel system, crane lift climbing formwork system, hydraulic climbing formwork system, dam formwork, single side supporting formwork, reinforcement installation platform, heavy duty load bearing tower, safety protection facilities and spare parts of various formwork systems.
With more than 15 years' rich experiences in formwork industry ForPro technical team has won high reputation from our customers. Relying on profound technical accumulation and strong R&D capability, ForPro provides projects with economic and efficient formwork solution package. We can develop custom-made formwork system according to client's special requirements and we can also support our customers to renovate and upgrade their existing formwork facilities.
We successively provided formwork system and technical services to Karachi Nuclear Power Plant, Hongyanhe Nuclear Power Plant, Zhejiang Daishan Island project, Ningbo Metro Line 3 and Hefei Metro Line 4 project. Sutong GIL gallery project, Jinsha river bridge, Xinpu chemical tank, Guanghui LNG tank, Chaozhou Huafeng LNG tank, Tangshan LNG, Yangshan LNG,Yanglin LNG tank, Xiapu Nuclear power plant and Fangchenggang Diesal plant project etc.