PP Spunbond Fabric Sewing Machine Parts Making Machine

China PP Spunbond Fabric Sewing Machine Parts Making Machine, Find details about China PP Spunbond Fabric, Non Woven Fabric Machine from PP Spunbond Fabric Sewing Machine Parts Making Machine

Model NO.
SS
Gram Weight
10-120G/M2
Speed
350m/Min
Embossing Pattern
Diamond, Oval, Cross, Line
Product Name
PP Spunbond Nonwoven Fabric Machine
Trademark
YANPENG
Transport Package
None
Specification
29*13*10M
Origin
Wenzhou, Zhejiang
HS Code
8449009000
Model NO.
SS
Gram Weight
10-120G/M2
Speed
350m/Min
Embossing Pattern
Diamond, Oval, Cross, Line
Product Name
PP Spunbond Nonwoven Fabric Machine
Trademark
YANPENG
Transport Package
None
Specification
29*13*10M
Origin
Wenzhou, Zhejiang
HS Code
8449009000
PP Spunbond Fabric Sewing Machine Parts Making Machine

Product Description

This polypropylene (PP) spunbonded nonwoven fabric production line has advantages of superior permance ,beautiful color and good quality.

Our production line is more reasonable in design and operation after practices for many years and improvements by our company.It can also add recycled material and stuffing to reduce the cost of products.
High processed products from PP spunbonded nonwoven fabric is widely used in suit cover, knitwear cover ,garderobe cover,table cloth,other products include pillow slip,bedspread,car cover,cover for quilt,computer,air conditioner and fan cover etc.It also used in suit clad and linning ,shoes lapping cloth,shoes bag,shoes cover etc.

Working process

 

PP Spunbond Fabric Sewing Machine Parts Making Machine

Production Application

 

ModelYP-SS 
Product width1600mm2400mm3200mm
Machine size29*13*10 m30*14*10 m32*15*10 m
Speed350 m/min350 m/min350 m/min
Gram weight10-180 g/m210-180 g/m210-180 g /min
Output(products according to 20 g/m2)9-10 T/Days13-14 T/Days18-19 T/Days
Certificate
ISO9001, CE Certificate, SGS Certificate

Working process flow
Feeding→Extrusion Melting→filtering→metering→spinning→Cooling→Stretching
→Web spreading→Thermal bonding→slitting→collecting

Our Service

Installation:

The seller will send 2 or 4 engineers to install, test the production line and train customers' workers in buyers' factory. It will take 1 month for whole installation and training.
The buyer should cover engineers' salary and visa cost. And the buyer should cover Round air tickets, accommodations, transportation in buyers' country, food, medical care, safety cost, and related cost happens in buyers' country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations.
Guarantee:
Guarantee period for the delivered equipment will be 12month after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller's technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.
The above item does not include the parts, which have regular spares or the parts damaged from normal wear, abnormal operation, improper maintenance and inadequate civil works. The seller is not liable for any production loss under any circumstances.
Packing:
As per export standard, they will also be treated before delivery against damage and rusting.


Company Profile