Rht -120wd Golden Injection Molding Machine Water Chiller

China Rht-120wd Golden Injection Molding Machine Water Chiller, Find details about China Water Chiller, Chiller from Rht-120wd Golden Injection Molding Machine Water Chiller

Model NO.
RHT-120WD
Certification
CSA, RoHS, UR, ISO, UL, CE, CCC
Condition
New
Capacity Controlling
0-100%
Frequency
50/60Hz
Size
3200X1150X1650mm
Weight
2550kg
Warranty
12months
Cooling Capacity
396kw
Trademark
Ruihai
Transport Package
Plywood Case
Specification
Standard quality. SGS, CE
Origin
Shenzhen
HS Code
8418699090
Model NO.
RHT-120WD
Certification
CSA, RoHS, UR, ISO, UL, CE, CCC
Condition
New
Capacity Controlling
0-100%
Frequency
50/60Hz
Size
3200X1150X1650mm
Weight
2550kg
Warranty
12months
Cooling Capacity
396kw
Trademark
Ruihai
Transport Package
Plywood Case
Specification
Standard quality. SGS, CE
Origin
Shenzhen
HS Code
8418699090
RHT-120WD Golden Injection Molding Machine Water Chiller
Rht-120wd Golden Injection Molding Machine Water Chiller
Features
1. Excellent cooling capacity, quiet, low electricity consumption.
2. Accurately maintain temperature within 3~5 degree.
3. LCD Screen display for chilled water outlet and inlet temperatures setting.
4. Single, double or four compressors combination unit is available.
5. High efficiency, elegant appearance, English and Chinese human-machine interface.

Rht-120wd Golden Injection Molding Machine Water Chiller


Structure Drawing

Rht-120wd Golden Injection Molding Machine Water Chiller

Working PrincipleRht-120wd Golden Injection Molding Machine Water Chiller

Applications

pharmaceuticals industry: synthesis, hydrolysis, esterification, etherification and other processes that require temperature control
Chemical: rubber crush
Metal treatment: low temperature quenching
Electronics: Parts Environmental Testing
Food Industry: ultra-low temperature marine refrigeration system and ultra-low temperature food processing and storage

Package & Shipping
Use standard export plywood case with forklift truck feet, easy to load and unload
5-7 days to finish the production after receiving the deposit
Shipping by LCL or FCL


After-sales service

12 months quality warranty since the date of delivery.
Free of charge to replace new chillersif quality problems.
Cost price to buy extra parts with Chillers from Ruihai if needed.
24 hours online service by e-mail, WhatsApp, Skype or Telephone Calling.
Installation Video to help installation even send engineer to customer's jobsite if needed.