China Pfl1250 Limestone Complex Crusher for Construction Materials

China Pfl1250 Limestone Complex Crusher for Construction Materials, Find details about China Crushing Equipment, Cement Crusher from China Pfl1250 Limestone Complex Crusher for Construction Materials

Model NO.
PFL1250
Finished Surface
Thread Process
Certification
CE, ISO
Condition
New
Color
Yellow
Motor Power
250kw
Outline Dimension
2370*1100*1300
Max. Feed Size
100mm
Output Size
0-3mm (70-90%)
Trademark
ATAIRAC
Transport Package
Wooden Box Packing and Nude Packing
Specification
15t
Origin
China
HS Code
847420900
Model NO.
PFL1250
Finished Surface
Thread Process
Certification
CE, ISO
Condition
New
Color
Yellow
Motor Power
250kw
Outline Dimension
2370*1100*1300
Max. Feed Size
100mm
Output Size
0-3mm (70-90%)
Trademark
ATAIRAC
Transport Package
Wooden Box Packing and Nude Packing
Specification
15t
Origin
China
HS Code
847420900
Product Introduction
China Pfl1250 Limestone Complex Crusher for Construction Materials


PFL series vertical complex crusher is a new type fine crushing, coarse grinding machine that integrated domestic and foreign similar crusher advanced technology. It combines mechanism of impacting and grinding. Our company is industrial drafter of this crusher.
The crusher is widely used in crushing operations of cement raw materials and cement clinker. It is not only the ideal fine crushing equipment for energy saving in cement plant technical upgrade, but also applies to fine crushing of varieties of solvent raw materials in iron and steel metallurgical industry.


Product Features
  1. Cross-type crushing ensures high throughput, high through speed, high capacity, thus low energy consumption.
  2. The rotor goes through static balance test, so the vibrating is smaller and the noise is lower.
  3. Optimized design of rotor forms multistage and successive crushing chamber, which can maximize the utilization of power and space, so as to improve the performance of the machine.
  4. The hammer is adjustable by 4 pieces of adjusting block, which can realize 6 levels adjusting and 30mm adjusting space. By this way, the utilization ratio of hammer is largely increased.
  5. The hammerhead uses high abrasion-resistance alloy which ensures abrasive resistance and long service life.
  6. The integrating installation of motor and main frame occupies small installation space, which makes the installation work and maintenance easier.
  7. When PFL crusher cooperates with mill, the mill productivity can be increased by 40%, and the power consumption of the production system can be decreased by 30%.
Technical Parameters
Model
Feed Size
(mm)
Discharge Size
(mm)
Main shaft Rotating Speed
(rpm)
Capacity
(t/h)
Power
(kw)
PFL-750III≤100≤3 (70-90%)800-13508-2045
PFL-1000III≤120≤3 (70-90%)650-98015-3055
PFL-1250III≤150≤3 (70-90%)510-77035-4590
PFL-1500III  (II IX)≤180≤3 (70-90%)430-64050-70132
PFL-1750III  (II IX)≤200≤3 (70-90%)420-54070-100160
PFL-2000III≤220≤3 (70-90%)360-54090-120200
PFL-2300III≤240≤3 (70-90%)330-450120-160250

Application Site
China Pfl1250 Limestone Complex Crusher for Construction Materials

Test Running
China Pfl1250 Limestone Complex Crusher for Construction Materials

Before delivery, we do trail running on the crusher, the technicians will check the vibration, noise, heating and other conditions of the crusher. Unqualified products could not be delivered to the customers.

Company Overview
China Pfl1250 Limestone Complex Crusher for Construction Materials


FAQ
1. How long is the date of delivery?

30 working days after payment of earnest money or depends on order quantity.

2. How long is the gurantee period of your company's vertical complex crusher?
We guarantee quality of the machines  (excluding wearing parts) for a period of one year from the date of trial run finish under our technician's guidence.

3. What's the after sale service of your company?
We will send engineers to guide your workers to install the machine, take trial run; the buyer should prepare the materials and tools needed, and offer necessary assistance. The actual expenses incurred for accommodation, to and from travel for the engineer, and insurance, should be borne by the buyer.