China Light Steel Structure Flat Roof Sandwich Panel Material Prefab Villa/Modular House, Find details about China Prefab House, Container House from Light Steel Structure Flat Roof Sandwich Panel Material Prefab Villa/Modular House
I Easy Mobile Container House | II Fast Construction Steel Sandwich Prefab House | III Permanent Living Cement Prefab House |
15 Years Life Span A1 Level Fireproof 8 Levels Earthquake Resistance 150km/h Wind Load -50°C-50 °C Temperature Resistance 1-3 Storey 8-10 Sets/40Hq Loaded 4 Workers Finish 1 Set In 3 Hours | 15 Years Life Span A1 Level Fireproof 8 Levels Earthquake Resistance 150km/h Wind Load -50°C-50 °C Temperature Resistance 1-3 Storey About 120m2 House /40HQ Loaded 5-6 Workers Finish 300m2 House In2-5 Days | 50 Years Life Span A1 Level Fireproof 8 Levels Earthquake Resistance 180km/h Wind Load -50°C-50 °C Temperature Resistance Construct High-Rise Building About 100m2 House/40HQ Loaded 5-6 Workers Finish 200m2 House In 2-5 Days |
|
Component | Description |
Main Steel Structure | 2-4mm Hot Galvanized Steel+Power Coating |
Wall Panel | 50,75,100mm Eps/Rock Wool/Glass Wool Sandwich Panel |
Roof Panel | 50,75,100mm Eps/Rock Wool/Glass Wool Sandwich Panel |
Flooring | 18mm Water Proof Mgo Board +2mm Floor PVC Leather |
Door | 900mm*2000mm Or As Request |
Window | 800mm*1000mm Or As Request |
Component | Description |
Main Steel Structure | Hot Galvanized Steel Structure,And Power Coating As Weather Request |
External Wall Panel |
|
Internal Wall Panel | |
Roof Panel | Mainly Similar As Above Wall Panel, Except The Face Is Corrugated Color Steel Panel For Rain Water Easier Flowing |
Door | Size As Request |
Window | Size As Request |
Component | Description |
Main Steel Structure | Hot Galvanized Steel Structure,And Power Coating As Weather Request |
External Wall Panel |
|
Internal Wall Panel | |
Floor Supporting Panel | |
Roof Panel | |
Door | Size As Request |
Window | Size As Request |
Item | I Container House | Ii Steel Sandwich Panel House | Iii Permanent Living Cement Prefab House |
External Wall | Painted Steel Wall Surface Used Directly Or Decorated As Like | Painted Steel Wall Surface Used Directly Or Decorated As Like | Stone Painting, Latex Painting Directly Or As Request |
Internal Wall | Painted Steel Wall Surface Used Directly Or Decorated As Like | Painted Steel Wall Surface Used Directly Or Decorated As Like | Latex Painting/ Ceramic Tiles/Pasting Wallpaper/ Wood Panel |
Roof | Painted Steel Roof Used Directly Or Decorated As Like | Painted Steel Roof Used Directly Or Decorated As Like | Asphalt Waterproof Roll Or Roof Tiles |
Floor | PVC Leather Or As Like | Ceramic Tiles/Wooden Floor/PVC Leather | Ceramic Tiles/Wooden Floor |
Ceiling | Painted Ceiling Steel Surface Used Directly Or Decorated As Like | Gypsum Board / Wood Pane | Gypsum Board / Wood Panel |
Door | Steel Security Door/Aluminum Alloy Door / PVC Door/ Wooden Door | ||
Window | PVC/Aluminum Alloy Sliding Window With Double/Single Glass With Guard Railing Or Screen Window As Like | ||
Kitchen | Kitchen Cabinet And Kitchen Ware | ||
Bathroom | Shower Room, Bathtub, Toilet And Washing Basin | ||
Electrical System | Socket, Switch, Power Distribution Cabinet, Wire Hidden Installation In The Wall Panel | Socket, Switch, Power Distribution Cabinet, Wire Hidden By Wire Slot | Socket, Switch, Power Distribution Cabinet, Slotted And Installed In The Wall Same As The Traditional Concrete Building |
Water System | Outside The Wall | Outside The Wall | Slotted And Installed In The Wall Same As The Traditional Concrete Building |
Roof Drainage System | Roof Reserved Water Falling System | Installed Same As Traditional Way | |
Solar Power System | Professionally Fitted Solar Power System From 2006 |
Prefabricated House / Prefab House / Modular House / Prefab Steel Building / Pre Engineered Building / Mobile House / Movable House / Prefabricated Home / Light Steel Frame Structure Building / Villa / Apartment / Accommodation / Labor Camping / Tent / Cabin / Office / School / Classroom / Hotel / Warehouse / Workshop / Plant / Carport / Restaurant / Dormitory / Permanent Living House Projects / Temporary Living House Project |
Step 1:Customer Select standard designs or sends detail design ( Layout with size, Appearance etc) together with tech data |
Step 2: Customized Solution with Quotation would be sent based on request |
Step 3: Negotiate and confirm each details of goods, trading terms and so on, get agreement and sign contract. |
Step 4: Advanced payment and arrange production, to confirm the delivery time with customer |
Step 5: Factory Examine Goods/ rectify and reform to meet the requirements of contract. |
Step 6: Balance payment and shipping in time |
Step 7: Handing Shipping files to help clients get goods from transporter in time. |
Step 8: Customer prepares to do foundation work after receiving foundation information |
Step 9: Customer gets goods and on site construction, would send engineer to help to install and train labors as request and go into warranty time |
|