Scaffolding Jack Base for Construction

China Scaffolding Jack Base for Construction, Find details about China Base Jack, Scaffolding Screw Jack Base from Scaffolding Jack Base for Construction

Model NO.
SM-jack
Erection Position
Internal Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Jack Base
Construction Properties
Building Scaffold
Item
Scaffolding Screw Jack Base
Business Type
Manufacturer in Guangzhou, South of China
Finishment
DIP Painting, Galvanized
Length
600/670/ 700mm
Diameter
30/34mm
Delivery Time
20days After Deposit Received
Delivery Term
FOB, EXW, CNF
Payment Term
T/T, L/C
Color
Silver, Red
Jack Type
Hollow, Solid
Trademark
SHUANGMA
Transport Package
Steel Pallet, Customised
Specification
BS1139, SGS
Origin
Guangdong, China
HS Code
730840000
Model NO.
SM-jack
Erection Position
Internal Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Jack Base
Construction Properties
Building Scaffold
Item
Scaffolding Screw Jack Base
Business Type
Manufacturer in Guangzhou, South of China
Finishment
DIP Painting, Galvanized
Length
600/670/ 700mm
Diameter
30/34mm
Delivery Time
20days After Deposit Received
Delivery Term
FOB, EXW, CNF
Payment Term
T/T, L/C
Color
Silver, Red
Jack Type
Hollow, Solid
Trademark
SHUANGMA
Transport Package
Steel Pallet, Customised
Specification
BS1139, SGS
Origin
Guangdong, China
HS Code
730840000
Construction Scaffolding Adjustable Screw Jack Base

Scaffolding Jack Base for Construction 
Scaffolding Jack Base for Construction
NameJack base/U head jack
Place of OriginGuangzhou China
Brand nameShuangma
SizeØ30/Ø34/Ø38/Ø48mm*600/700/800mm, or as your request
Main MaterialQ195,Q235,Q345
Sufrace TreatmentHigh Protected Painted, Electric Galvanized, Hot Dip Galvanized.
ApplicationFor scaffolding adjust or support
ColorSilver, Orange,dark red,as your request
CertificateSGS, EN12810.
ServiceOEM Service avaliable
MOQ1X20GP
PaymentT/T,L/C,Cash
Delivery TimeAbout 15-30 days after confirmation
PackingIn bulk or steel pallet or as your request
Production Capability100 tons per day
Manufactory Location Guangzhou,China


Scaffolding Jack Base for Construction

Established in 1986, with over 30 years experiences in scaffolding and formwork system, Guangzhou Shuangma Steel Template Co., Ltd has become your reliable supplier.

Shuangma factory covers an area of 30,000 square meters, which daily output is more than 100 tons.

With experienced technicians, engineers and advanced machinery, we are not only able to manufacture and sell various types of scaffolding and formwork system products, we are also able to provide reliable, safe and innovative scaffolding and formwork solutions which are tailored to meet the needs of our customers' projects.

Shuangma is a customer focused company, always engaging in developing new technology, delivering high quality products and solutions through our commitment to long term "win-win" relationships with our customers.


Our main products include Ringlock scaffolding, Frame scaffolding, Kwikstage scaffolding, Cuplock scaffolding, Quicklock scaffolding, Scaffolding plank, Shoring props, Formworks, formwork clamps, steel pipes & couplers, U head jack & jack base, and other scaffolding accessories.

Feel free to contact us for further information. Looking forward to cooperating with you!
Scaffolding Jack Base for Construction
Scaffolding Jack Base for Construction
Scaffolding Jack Base for Construction
Scaffolding Jack Base for Construction

1. Q: what kind of international certificate do you have have?

    A:  EN12810 certificate & SGS test report.
 

2. Q: What kind of payment term do you accept?

    A: We accept both TT and LC.
 

3. Q: Where have you been exported?

    A: We have exported scaffolding to Asia, South America, Africa and Middle east.
 

4. Q: What is your steel grade?

    A: Q195, Q235,Q345
 

5. Q: How does your factory control quality?

    A: Quality is priority. We follow the ISO system for all quality management.

 

6. Q: How is the bearing capacity of your scaffolding?

    A: It depends on which kind of scaffolding, scaffolding sizes, and the setup plan. We have many test          reports for your reference.
 

7. Q: How high can your scaffolding reach to?

    A: Normally, we suggest our client to setup the scaffolding maximum reach to 30 meters. But some of our customers setup our scaffolding reach to 60 meters. According to safety documents, every 20 meters, we need to make a steel platformwhere the scaffolding can be setup continually.

 

8. Q: How is the life span of your scaffolding?

    A: It depends on how you use it and how you store it. Normally, the life span of our scaffolding is 5-7 years.
 

9. Q: How can you assure the welding quality?

    A: We have made the flaw detection test which can prove the good welding quality.

 

10.Q: How is your factory's production capacity?

     A: Over 3000 tons per month


STAY SAFE WITH OUR SCAFFOLDING!
YOU SEE YOUR VIEW, WE SEE YOUR SUCCESS...
 
NameJack base/U head jack
Place of OriginGuangzhou China
Brand nameShuangma
SizeØ30/Ø34/Ø38/Ø48mm*600/700/800mm, or as your request
Main MaterialQ195,Q235,Q345
Sufrace TreatmentHigh Protected Painted, Electric Galvanized, Hot Dip Galvanized.
ApplicationFor scaffolding adjust or support
ColorSilver, Orange,dark red,as your request
CertificateSGS, EN12810.
ServiceOEM Service avaliable
MOQ1X20GP
PaymentT/T,L/C,Cash
Delivery TimeAbout 15-30 days after confirmation
PackingIn bulk or steel pallet or as your request
Production Capability100 tons per day
Manufactory Location Guangzhou,China