Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts

Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts, Find details about China Nitrogen Spring Mould Component, Plastic Injection Mold from Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts

Model NO.
DSWF
Usage
Plastic Injection Mould
Product Name
Nitrogen Springs
Trademark
wmould
Transport Package
Shenzhen Port, Guangzhou Port and Another Port in
Specification
according to customer requirements
Origin
China
Model NO.
DSWF
Usage
Plastic Injection Mould
Product Name
Nitrogen Springs
Trademark
wmould
Transport Package
Shenzhen Port, Guangzhou Port and Another Port in
Specification
according to customer requirements
Origin
China
Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts

                     Welcome OEM/ODM Orders
Product Description
 Product nameWmould China factory  light load coil springs stamping compression die spring mould parts
MaterialSKD61,SKH51, SKD11, S136 , SUJ2, Aluminum Alloy ect
ToleranceCan be ±0.002mm,high accuracy
Processing stepmaterial cutting→turning→milling→heat treatment→coreless grinding→wire EDM→surface treatment→polishing→inspection→packing&shipping
Surface treatmentBlackening, phosphating, pickling, electroless plating of various metals and alloys, TD treatment, QPQ treatment, chemical oxidation, anodizing, electrochemical polishing, electroplating, sand blasting, polishing, rolling, polishing, brushing, spraying
Processing equipmentCNC lathe, CNC turning milling grinding drilling machine,Wire E.D.M,PG ,Cylindrical internal grinding machine,Grinder,planer,spark Machines,  
Inspection instrumentprojector,height gauge,three dimensional measuring instrument,microscope,height gauge,thickness meters.
International standardNon-standard and standard(DME,HASCO,DIN,MISUMI)
QC SystemPre-inspection, intermediate inspection, post-inspection, three procedures to ensure that each product is qualified
Quality assurance99.9% qualified 
Delivery timegeneral 10-15 days,large QNT 1-2 month,
Shipmentinternational express(DHL FedEx TNT UPS EMS SF Express)
After-Sales ServiceIf product is damaged,refund or repair for customer,until the customer is satisfied
SampleSample can be provided.
MOQ≥1pcs
Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts


Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts
Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts
Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts
Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts

Factory show
Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts
Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts

Quality Inspection

Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts

Certification

Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts

Customer&Exhibition show

Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts

Packging&shipping

Wmould China Factory Light Load Coil Springs Stamping Compression Die Spring Mould Parts

FAQ

1. Are you a manufacturer or a trading company?
We are direct manufacturer with over 18 years' export experience for precision parts, welcome to visit us.


2. How can I get the quotation?
Please contact our sales man with your demands,information include material,model number and any other special requirements.


3. Can you produce precise parts according to our drawing or our samples?
Yes, we can produce parts according to your 2D or 3D drawings, and we can make measurement for your samples to make drawings for production.


4 . What is the quality guarantee?
We will make 100% inspection before packing and delivery to make sure the products 100% meet your requirements.
We will keep the production drawing and test report with 3 months, if you found any problems when received the parts, please contact us at the first time, we will give you a solution within 8 hours.


5. How do you guarantee the deliver time?
We have independent PMC department to arrange the production plan.
We have production meeting every morning to report the production progress and discuss the problems.
We will make production progress report to you every week and take some pictures for your reference, that's you can know our production progress clearly.