China Physical Treatment of Wastewater Chemical Sludge Treatment Sludge Dryer, Find details about China Sludge Treatment, Wastewater Treatment from Physical Treatment of Wastewater Chemical Sludge Treatment Sludge Dryer
Model | BOE5000YR | BOE10000YR | BOE15000YR | BOE20000YR | BOE25000YR |
Standard water removal capacity/24h | ~5000kg | ~10000kg | ~15000kg | ~20000kg | ~25000kg |
Water removal capacity/h | ~208kg | ~416kg | ~624kg | ~832kg | ~1040kg |
Operation power | 13kw | 26kw | 39kw | 52kw | 65kw |
Standard heating power | 200kw | 400kw | 600kw | 800kw | 1000kw |
Hot water flow capacity | 8.6m³/h | 17.2m³/h | 25.8m³/h | 34.4m³/h | 43m³/h |
Standard cooling flow capacity | 180kw | 360kw | 540kw | 720kw | 900kw |
Cooling water flow △t=12ºC | 13m³/h | 26m³/h | 39m³/h | 52m³/h | 65m³/h |
Heat exchange modules quantity | 1set | 2set | 3set | 4set | 5set |
External structure mm | 4900*3110*3200 | 8150*3110*3200 | 11400*3110*3200 | 14650*3110*3200 | 17900*3110*3200 |
Structure type | whole package | assemble package | assemble package | assemble package | assemble package |
Weight | 5.7t | 8.6t | 12.3t | 14.8t | 16.5t |
Note | 1 Module Double layer | 2 Module Double layer | 3 Module Double layer | 4 Module Double layer | 5 Module Double layer |
Model | BOE30000YR | BOE35000YR | BOE40000YR | BOE45000YR | BOE50000YR |
Standard water removal capacity/24h | ~30000kg | ~35000kg | ~40000kg | ~45000kg | ~50000kg |
Water removal capacity/h | ~1248kg | ~1458kg | ~1667kg | ~1875kg | ~2083kg |
Operation power | 78kw | 91kw | 104kw | 117kw | 130kw |
Standard heating power | 1200kw | 1400kw | 1600kw | 1800kw | 2000kw |
Hot water flow capacity | 51.6m³/h | 60.2m³/h | 68.8m³/h | 77.4m³/h | 86m³/h |
Standard cooling flow capacity | 1080kw | 1260kw | 1440kw | 1620kw | 1800kw |
Cooling water flow △t=12ºC | 78m³/h | 91m³/h | 104m³/h | 117m³/h | 130m³/h |
Heat exchange modules quantity | 6set | 7set | 8set | 9set | 10set |
External structure mm | 21500*3110*3200 | 24400*3110*3200 | 27650*3110*3200 | 30900*3110*3200 | 34150*3110*3200 |
Structure type | assemble package | assemble package | assemble package | assemble package | assemble package |
Weight | 20.4t | 23.4t | 26.3t | 29.3t | 32.2t |
Note | 6 Module Double layer | 7 Module Double layer | 8 Module Double layer | 9 Module Double layer | 10 Module Double layer |
Standard heating condition | 90ºC/70ºC(hot water etc.) |
Cooling condition | 33ºC/45ºC(cooling water) |
Power supply | (220V\380V\440V)/3H/50Hz(60Hz) |
Standard drying temperature | 50~65ºC(return air)/65~85ºC(air supply) |
Heat source | Flue gas waste heat (heat exchanger), steam condensate, generator waste heat, anaerobic digestion (gas to hot water) sludge cracking, gasification and combustion to produce hot water, etc. |
Control system | Touch screen+PLC Programmable Controller |
Application scope of wet sludge | Moisture content (40%-83%)(Different water content has different adaptability) |
Dry sludge moisture | Frequency conversion adjustment, moisture content(10%-60%)(The adjustment range of the moisture content of the dry sludge will be different according to the different moisture content of the mud ) |
Forming method | Cutting and extruding (different moisture content and sludge properties should be suitable for selection) |