China 2018 New Style PP Fr Industrial Coverall, Find details and Price about China Summer Fire Retardant Coveralls, Fire Retardant Coveralls from 2018 New Style PP Fr Industrial Coverall
Style Name: | 2019 new style pp fr industrial coverall |
Functions | Industrial workwear,painter workwear,man workwear,factroy workwear,reflective workwear,colourful workwear. |
Shell fabric | Option 1: TC, 65% polyester, 35% cotton, Twill, 195GSM, 21x21/108x58 |
Option 2: TC, 80% polyester, 35% cotton, twill, 190GSM, 21x21/108x58 | |
Option 3: TC, 65% polyester, 35% cotton, plain, 165GSM, 23x23/88x64 | |
Option 4: 100% cotton, twill, 180GSM, 21x21/108x58 | |
Option 5: 100% cotton, plain, 185GSM, 20x20/100x55 | |
Option 6: 100% cotton, twill, 270GSM, 16x12/108x56 | |
Lining | no lining |
Details | Button: Seven concealled poppers on center front,Two concealled popper on chest pocket flap. |
Features | Elastic waistband on back, Front rever collar with stud, EN471 HV tape. |
Pockets | Two pockets with plap on chest, two side hip pockets, one back pocket,one ruler pocket,one hammer loop. |
Size | S-4XL or follow client requirements |
Logo | Printed or Embroidered / OEM |
Delivery time | 45-90 days after order confirmed on base of quantity. *We have large capacity of this style. Our capacity of each month is 40000PCS. We can make sure the delivery time for each client. |
Position/Size | S | M | L | XL | 2XL | 3XL | 4XL |
1/2 chest width | 55.5 | 59.5 | 63.5 | 69 | 73 | 77 | 81 |
1/2 waist | 42.5 | 45.5 | 48.5 | 53.5 | 57 | 61 | 66 |
1/2 waists stretched | 54 | 57 | 61 | 65 | 68 | 72 | 77 |
1/2 seat | 61.5 | 64.5 | 67.5 | 69.5 | 71.5 | 73.5 | 75.5 |
inner length | 79 | 79 | 79 | 79 | 79 | 79 | 79 |
MOQ | 1000PCS | |
Trade Terms | FOB,CIF,CNF,DP(Negotiable) | |
Loading Port | Dalian(Negotiable) | |
Payment Terms | TT(30%deposit,70%against the copy of B/L),L/C,Western Union | |
Packaging | G.W/N.W | 16/15KGS |
Carton Size | 57*35*31.5CM | |
20FT can load 9120PCS | ||
40FT can load 18500PCS | ||
40HQ can load 20000PCS | ||
1PCS/POLYBAG,20PCS/CTN | ||
Sample Time | 5-15days | |
Delivery Time | 60-90days after we receive deposit | |
Supply Ability | 40,000 sets uniform/month |