New Design Filling Machine Mineral Water Bottling Plant a to Z

China New Design Filling Machine Mineral Water Bottling Plant a to Z, Find details about China Mineral Machinery, Packing Machine from New Design Filling Machine Mineral Water Bottling Plant a to Z

Model NO.
BY
Filling Principle
Gravity
Packaging Container Lifting Structure
Pneumatic Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Processing Type
Water
Processing
Filling
Control
PLC
Certificate
ISO9001
Trademark
Beyond
Transport Package
Export standard packages
Specification
ISO9001
Origin
China, zhangjiagang
HS Code
8422309010
Model NO.
BY
Filling Principle
Gravity
Packaging Container Lifting Structure
Pneumatic Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Processing Type
Water
Processing
Filling
Control
PLC
Certificate
ISO9001
Trademark
Beyond
Transport Package
Export standard packages
Specification
ISO9001
Origin
China, zhangjiagang
HS Code
8422309010
New Design Filling Machine Mineral Water Bottling Plant
New Design Filling Machine Mineral Water Bottling Plant a to Z

Feature:
1. Machine: The line is composed of bottle washing machine, bottle filling machine and sealing machine.

2. Applicable to plastic bottle, glass bottle, can fill and mineral water, super water, fruit juice, health drink, soy squce, vinegar and wine and so on.

3. The Capacity is 2000bph, and volume of bottle is from 250ml-2000ml.

4. Every six barrels detected by sensors are conveyed to Filler levelly with the next six barrels be blocked by Barrel-block device. Fore-barrel-puller pulls the barrels to filling position and the filling system will lift the empty barrels to certain height for filling.

5. When filling done barrels return to the level, then Back-barrel-puller forces barrels unto conveying chain, meanwhile the Barrel-block device is reset for full barrels out and empty barrels in. Then the whole process is done.

Our BEYOND Separate Washing Filling&Capping machine is your best choice.
 Model:BY
 Filling heads: 6
 Suitable bottle Polyester or PET or PE
 Air source 0.6-0.8 M Pa
 Air consumption 1m³
 Filling pressure Normal pressure
 Filling Temperature  Normal
 Power 37 kw
 Dimension 1600*1100*1800mm
  Weight: 0.3 T
 Volume  5L~10L
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
 

 
New Design Filling Machine Mineral Water Bottling Plant a to Z
New Design Filling Machine Mineral Water Bottling Plant a to Z