Odex190 Eccentric Overburden Drilling System

China Odex190 Eccentric Overburden Drilling System, Find details about China Odex190, Odex190 System from Odex190 Eccentric Overburden Drilling System

Model NO.
ODEX190, ODEX240, ODEX280
Origin
Changsha, Hunan
HS Code
82071300
Model NO.
ODEX190, ODEX240, ODEX280
Origin
Changsha, Hunan
HS Code
82071300
About us:

We are a leading manufacturer of rock drilling tools, like DTH hammers and bits, DTH drill pipes, RC hammers and bits, tophammer button bits, coupling, cross bits, drill rods located in Changsha, Hunan, China.
We have rich experience in this field of DTH hammers and bits for 20 years.
Owing to high quality, professional serivce and competitive price, we have gotten good reputation from our customers from all over the world, such as France, Spain, Italy, South Africa, Iran, Malaysia, Australia ad etc.




Product specifications: ODEX190 system


 
1Casing TubeMaximum OD:222mm
Minimum ID:205mm
2Drill PipeConnection Thread:API 3 1/2"Reg
OD: 114mm
Wrench Flats: 95mm
3Guide SleeveEffective length: 285mm
4DTH hammerHD65,Cop64,SD6,DHD360,QL60,MISSION60
5Casing ShoeL3=110mm L4=70mm D3=204.5mm D4=193mm
6Guide DeviceL1=62.5mm L2=184.5mm D1=191mm D2=203mm
7ReamerD5=185.5mm L5=90.2mm
Reaming Diameter:237mm
Reamer has 7x16mm buttons
8Pilot BitD6=190mm L6=82mm
Gauge Button: 9x18mm
Face Button: 9x16mm

Odex190 Eccentric Overburden Drilling System
 




We can also provide related products DTH hammers, ODEX system, symmetrix systems, slide block drilling systems, etc and DTH drilling pipes for various thread API REG, API IF, BECO, etc


Product photos


Odex190 Eccentric Overburden Drilling System


Quality warranty:

Our products are made of high quality steel and all spares parts are inspected strictly before shipping. We have quickly responses for your complaint and suggestion.


Package:
Using ply-wooden cases and pallet for package to protect the products and avoid the damagement during transportation. Also we can customize package according to your special requests.




Production time:

Generally need 15-25 days


Transportation:
By air, By Express or By sea according to your requests.