Odex280 Eccentric Overburden Drilling System

China Odex280 Eccentric Overburden Drilling System, Find details about China Odex280, Odex280 System from Odex280 Eccentric Overburden Drilling System

Model NO.
ODEX280
Trademark
sollroc
Origin
Changsha, Hunan
HS Code
82071300
Model NO.
ODEX280
Trademark
sollroc
Origin
Changsha, Hunan
HS Code
82071300
About us:

We are a leading manufacturer of rock drilling tools, like DTH hammers and bits, DTH drill pipes, RC hammers and bits, tophammer button bits, coupling, cross bits, drill rods located in Changsha, Hunan, China.
We have rich experience in this field of DTH hammers and bits for 20 years.
Owing to high quality, professional serivce and competitive price, we have gotten good reputation from our customers from all over the world, such as France, Spain, Italy, South Africa, Iran, Malaysia, Australia ad etc.




Product specifications: ODEX280 system


 
1Casing TubeMaximum OD:324mm
Minimum ID:305mm
2Drill PipeConnection Thread:API 4 1/2"Reg
OD: 114mm
Wrench Flats: 95mm
3Guide SleeveEffective length: 305mm
4DTH hammerSD10 NUMA100
5Casing ShoeL3=125mm L4=75mm D3=304mm D4=281mm
6Guide DeviceL1=970mm L2=254mm D1=280mm D2=303mm
7ReamerD5=266mm L5=120mm
Reaming Diameter:378mm
Reamer has 22x18mm buttons
8Pilot BitD6=280mm L6=135mm
Gauge Button: 12x18mm
Face Button: 27x16mm


Odex280 Eccentric Overburden Drilling System
 




We can also provide related products DTH hammers, ODEX system, symmetrix systems, slide block drilling systems, etc and DTH drilling pipes for various thread API REG, API IF, BECO, etc


Product photos


Odex280 Eccentric Overburden Drilling System


Quality warranty:

Our products are made of high quality steel and all spares parts are inspected strictly before shipping. We have quickly responses for your complaint and suggestion.


Package:
Using ply-wooden cases and pallet for package to protect the products and avoid the damagement during transportation. Also we can customize package according to your special requests.




Production time:

Generally need 15-25 days


Transportation:
By air, By Express or By sea according to your requests.