Eccentric Overburden Odex Drilling System

China Eccentric Overburden Odex Drilling System, Find details about China Odex System, Eccentric Overburden Drilling System from Eccentric Overburden Odex Drilling System

Model NO.
ODEX90,ODEX115,ODEX140,ODEX165,ODEX190,ODEX240
HS Code
82071300
Model NO.
ODEX90,ODEX115,ODEX140,ODEX165,ODEX190,ODEX240
HS Code
82071300
About us:

We are a leading manufacturer of rock drilling tools, like DTH hammers and bits, DTH drill pipes, RC hammers and bits, tophammer button bits, coupling, cross bits, drill rods located in Changsha, Hunan, China.
We have rich experience in this field of DTH hammers and bits for 20 years.
Owing to high quality, professional serivce and competitive price, we have gotten good reputation from our customers from all over the world, such as France, Spain, Italy, South Africa, Iran, Malaysia, Australia ad etc.




Product specifications: ODEX240 system


 
1Casing TubeMaximum OD:273mm
Minimum ID:260.4mm
2Drill PipeConnection Thread:API 3 1/2"Reg
OD: 114mm
Wrench Flats: 95mm
3Guide SleeveEffective length: 343mm
4DTH hammerHD85,Cop84,SD6,DHD380,QL80,MISSION80
5Casing ShoeL3=110mm L4=65mm D3=259mm D4=241mm
6Guide DeviceL1=70mm L2=190mm D1=240mm D2=256mm
7ReamerD5=238mm L5=100mm
Reaming Diameter:308mm
Reamer has 14x16mm buttons
8Pilot BitD6=240mm L6=89.5mm
Gauge Button: 12x16mm
Face Button: 18x16mm

Eccentric Overburden Odex Drilling System
 




We can also provide related products DTH hammers, ODEX system, symmetrix systems, slide block drilling systems, etc and DTH drilling pipes for various thread API REG, API IF, BECO, etc


Product photos


Eccentric Overburden Odex Drilling System


Quality warranty:

Our products are made of high quality steel and all spares parts are inspected strictly before shipping. We have quickly responses for your complaint and suggestion.


Package:
Using ply-wooden cases and pallet for package to protect the products and avoid the damagement during transportation. Also we can customize package according to your special requests.




Production time:

Generally need 15-25 days


Transportation:
By air, By Express or By sea according to your requests.