Bottom of The Barrel Used for Washer by Injection Molding

China Bottom of The Barrel Used for Washer by Injection Molding, Find details about China Injection Mould, Washing Machine Mould from Bottom of The Barrel Used for Washer by Injection Molding

Model NO.
HRD-F2020040-10
Runner
Cold Runner
Design Software
UG
Installation
Fixed
Certification
ISO
Standard
HASCO
Customized
Customized
Mould Material
2738, Nak80, 718, 738h, 2344, S136, SKD11
Mould Base
Lkm, Hasco, Stiehl
Cavity
Single/Multiple
Trademark
Higrade
Transport Package
Wooden Box
Specification
ISO9001: 2008
Origin
China Qingdao
HS Code
8480710090
Model NO.
HRD-F2020040-10
Runner
Cold Runner
Design Software
UG
Installation
Fixed
Certification
ISO
Standard
HASCO
Customized
Customized
Mould Material
2738, Nak80, 718, 738h, 2344, S136, SKD11
Mould Base
Lkm, Hasco, Stiehl
Cavity
Single/Multiple
Trademark
Higrade
Transport Package
Wooden Box
Specification
ISO9001: 2008
Origin
China Qingdao
HS Code
8480710090
Key words: Washer mould, Washing machine mould, Laundry machine mould, Washer-drier mould, Two-tub washing machine mould, Impeller type washing machine mould, Automatic washing machine mould, Full auto washing machine mould, Rolling washer mould
Relevant products: Moulds for washing machine bucket bottom, washing machine cover, washing machine barrel, washer chassis parts, washing machine dehydration bucket, washing machine control panel
Mould material: 2738, NAK80, 718, 738H, 2344, S136, SKD11etc.
Mould base: LKM, HASCO, STIEHL etc.
Cavity: Single/Multiple
Runner: Cold/Hot runner (Yudo, Mastip, Mold master, Synventive etc. )
Drawing format: Igs, . Step, . X_t, . Pdf, . Dwg, . Dxf,
Plastic material: ABS, PA, PA66, PA6+GF, PC, PE, PP, PMMA, PS etc.
Mould life: 100, 000 to 3, 000, 000 shots
First trial time: 30~45 days after mould structure drawing confirmed
ISO9001: 2008 certified by SGS.
Bottom of The Barrel Used for Washer by Injection Molding
Bottom of The Barrel Used for Washer by Injection Molding
Bottom of The Barrel Used for Washer by Injection Molding
 
StepItemDescription
1QuotationWe offer you the mould and part quotation according to your details--- Product drawings or Samples, with  data of dimensions, product material, total quantity, weight.
2OrderIf our quotation is competitive and meet your mould requirements, you will place the order.
3Drawing confirmationWe design the mould structure drawings according to your product drawing or sample. Feedback of drawings will be given for confirmation during the period.
4Mould making1) After your confirmation of our drawing, we begin to make the moulds.
2) During manufacturing program, we send you Mould Building Progress with pictures every week, for you to know our machining process.
3) QC: We will conduct mould inspection in  all the machining process to ensure the mould quality.
5First trialWe will make the mould first trial on time, then send you video, picture and samples for you to confirm.
6Quality confirmYou will confirm our mould quality according to sample. If you need to adjust the product structure, we can help you change the mould further. 
7DeliveryShip the mould after it is completely OK, packed by wooden case.
8After-sale serviceWe will contact you regularlyby professional persons and give our advice and solutions for mould use.


Bottom of The Barrel Used for Washer by Injection Molding
Bottom of The Barrel Used for Washer by Injection Molding