Plastic Injection Tooling&Mold for Washing Machine Part

China Plastic Injection Tooling&Mold for Washing Machine Part, Find details about China Plastic Injection Mould, Plastic Injection Mold from Plastic Injection Tooling&Mold for Washing Machine Part

Model NO.
HRD-B20090301
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
TS16949, ISO
Standard
MISUMI
Customized
Customized
Trademark
Higrade
Transport Package
Wooden Case
Origin
China
HS Code
8480790090
Model NO.
HRD-B20090301
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
TS16949, ISO
Standard
MISUMI
Customized
Customized
Trademark
Higrade
Transport Package
Wooden Case
Origin
China
HS Code
8480790090
Mould Steel:2738HH,NAK80,738,2344,S136,SDK61,P20,PX5 etc.
Mould Life:50~100k shots
Material: PP
Cavity: 1*1
Applicable range: Automotive 
Lead Time: 35-45 days
Hot runner:Yes (according to the customer's request and product style)
Standard part: PUNCH, MISUMI
First trial equipment: 380T Injection Machine( moreover we also have 90-700T,750-1300T Injection Machine. There are robots for each 90-380T Injection Machine to meet the customer's bulk production requirement.
Plastic Injection Tooling&Mold for Washing Machine Part
Process step: product design-CAE-3D mold design-2D drawing-CAM-milling machine-grinder-drill-CNC-wire cutting-EDM-polishing-trial assembly-grind-assemble-first trial
Plastic Injection Tooling&Mold for Washing Machine Part
Our service: product and mould design, Injection mould and parts machining.
Our main customer: Haier, Hisense, Midea, Siemens, SANYO, ELX, Toyota, Kia, Foton, GM Wuling, Great wall, Hyundai, Skyworth.
 Overseas market: Japan, Korea, Thailand, Russia, Germany, England, Norway, Italy, USA, Spain, Turkey, Denmark, Brazil, Argentina, Egypt, South Africa, Iran,Pakistan,India.
Mould painting: according to Customer's request
Packing: Wooden Case
Plastic Injection Tooling&Mold for Washing Machine Part
The first trial success rate is above 95%
Quotation : provide quotation in 24hours after received the customer's drawing .
Design software: 2D/3D drawing or samples
Manager: Concentrate on project tracking and after service
Engineer: 30-50 excellent engineers, have many years experience and English communicating well.
The purchase department use EPR system to make sure buying materials in time.
70-130 experienced workers can meet the customer request of batch production.
Quality department:15 members quality control workers, testing the mould and parts by CMM and projector.
Domestic delivery: logistics transportation
Delivery to overseas: FOB/CIF/DDU by sea shipping or air shipping
 Plastic Injection Tooling&Mold for Washing Machine Part
Plastic Injection Tooling&Mold for Washing Machine Part
Plastic Injection Tooling&Mold for Washing Machine Part