En1254 Solder Ring Copper Elbow (AV8040)

China En1254 Solder Ring Copper Elbow (AV8040), Find details about China Elbow, Coppe Fittings from En1254 Solder Ring Copper Elbow (AV8040)

Model NO.
AV8040
HS Code
74122010
Model NO.
AV8040
HS Code
74122010
Solder ring copper Elbow(AV8040),


* Standard: EN1254

* Size:
Dia/ End length /Angle Length


SPECIFICATION






SizeDLR
8895
1212117
1515148.5
22221912
282822.515.5
353527.519
42423223
54543730

SizeMaterialStandardPack&DeliverySamples
8mm-54mmCopperEN-1254-1Delivery Way:
By sea:  
Asia: 7~10 Days from China to local Port .
Other country: wintin 30~35days to Local port .
By Air
By Express: within 3~5 days to customers office or home .

We offer one-stop services to your address or local port;
EXW-Term, Shipping via specified forwarder and shipping company 
With our current mould , samples can be offer within 10days after confirmed ;
ODM with customers drawings or samples: it will take 20 days to make new mould and offer samples 


OUR SERVICES
WHEN CAN I  GOT THE QUOTATION
We usually quote within 24 hours after we get your inquiry ; if you are very urgently to get the price , pls. call us at once or leave message on online chat or tell us you Tel number, we will regard your inquiry priority.

Samples:  
1) we can make the samples according to customer's samples or designs.
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days.
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you

Price Terms:
FOB, CNF,CIF.etc.
WE ACCEPT  MANY RATE , SUCH AS RMB, US DOLLAY, EUR, KORAD, POUND..ETC 
Payment Terms: 

1) T/T, 30% T/T deposit before production, pay the balance before shipment.
2) L/C at sight (for large quantity order)
3) 100% T/T in advance,   D/P

Order and Mass Production:
1) We will send PROFORMA INVOICE to you when the order is confirmed.
2)  We will start to have mass production when confirm our sample and 30% T/T deposit received.
3)  Quality is under the control and supervision during the production.
4)  Packing information will be confirmed before the production finished, If no special requirment, using our normal package.

 Quality control and inspection:

1)  Will be check by QC when Material & accessories inspection up arrival
2)  In line control on Each Step 
3)  Every one valve will be comprehensive review before packing
4) Sales will be spot check before shipping
 5)  Third Party inspection Such as CE, SABS and so on
 6)  Original authorization through ISO9001:2008