Newly Design Brass Kitchen Faucet

China Newly Design Brass Kitchen Faucet, Find details about China Faucet, Kitchen Faucet from Newly Design Brass Kitchen Faucet

Model NO.
GL8209A82
Pull Out Spray
Without Pull Out Spray
Number of Handles
Single Handle
Purified Water Outlet
Without Purified Water Outlet
Hot and Cold Water
Hot and Cold
360 Swivel
360 Swivel
Installation Type
Deck Mounted
Cartridge
25mm Ceramic Cartridge
Body Thickness
>2.5mm
Chrome Layer
0.15-0.20um
Nickel Layer
7-9um
Trademark
GLREAT
Specification
CE
Origin
China
HS Code
84818090
Model NO.
GL8209A82
Pull Out Spray
Without Pull Out Spray
Number of Handles
Single Handle
Purified Water Outlet
Without Purified Water Outlet
Hot and Cold Water
Hot and Cold
360 Swivel
360 Swivel
Installation Type
Deck Mounted
Cartridge
25mm Ceramic Cartridge
Body Thickness
>2.5mm
Chrome Layer
0.15-0.20um
Nickel Layer
7-9um
Trademark
GLREAT
Specification
CE
Origin
China
HS Code
84818090
Detail Description:

Kitchen Faucet GL8209A82

1.Ceramic disc cartridge 25mm
2.Material: H58 brass body. Zinc-alloy handle
3.Durable ceramic cartridge 25mm with filter and production date printed
4.Finish: Chrome plated, Corrosion test (neutral) 120 hours Chrome coat: 0.15-0.20μ M, Nickel coat: 7-9μ M
5.Various colors/finishes: Polished chrome, gold, antique bronze, brushed nickel, satin chrome
6.Accessories: Fixing kit, Aluminum F3/8x35CM hose with EPDM inner parts included
7.Five-year Warranty

Material : H59 brass , Cu > 59% , Pb < 1.27%
25mm ceramic cartridge
Body thickness : ≥ 2.5mm
Chrome layer : 0.15-0.2μm
Nickel layer : 7-9μm
NSS : 144 HRS  , ASS : 24 HRS 
Cartidge : With lifetime of 300,000 times open and close no leakage


Packing:

1.Inner Packing:Cloth bag and bubble bag with color box
2.Outer Packing:10pcs per carton ,The package can be designed by customer's requirement

Trade Terms:

1.The Price is based on FOB Ningbo
2.Supply ability:2000sets per day
3.MOQ :200 pcs
4.Payment : T/T Payment ,30% Deposit Before Production,Balance 70% Upon Receive the BL  Copy

Delivery Lead Time:

35-40 days after receiving 30% deposit

Process Scheme:

Feed-----Casting(Forging)-----Examination-----Machine Processing-----Examination-------Appearance Polishing-----Examination------Electro Plating------Examination--------Assembling-------Examination-------Packing-------Delivery