China AC 3 Phase 230/400V 60kw/75kVA Engine Super Silent Diesel Generator, Find details about China Stamford Alternator, Power & Generating Sets from AC 3 Phase 230/400V 60kw/75kVA Engine Super Silent Diesel Generator
Product Name | AC 3 phase 230/400V 60kw/75kva engine super silent diesel generator | ||
Model | UGY75PS | ||
Rated output (KW/KVA) | 60kw/75kva | ||
Rated voltage (V) | 230/400V | ||
Rated current(A) | 108.3A | ||
Rated frequency | 60Hz | ||
Power factor | 0.8lagging | ||
Noise level dB(a) | 70/1m | ||
Excitation | Stamford Brushless self-excitation | ||
Phase Number and connection | 3-phase 4-wire system | ||
Diesel Engine | Perkins 1104A-44TG2, 4 cycle, 4 cylinders,4.4 liters, Turbocharged | ||
Alternator model | brushless self-excited,IP23,Class H. | ||
Rated Power (kw/1500rpm) | 60kw/75kva | ||
Fuel consumption (g/kw*h) | ≤238 | ||
Cylinder number | 4 cylinders | ||
Displacement ( L) | 4.4 | ||
Cooling system | Water cooling | ||
Environmental Conditions | Altitude≤1000M, Cooling air temperature -15°C~ 40°C, Relative humidity≤90% | ||
Start Method | 12V Electric start | ||
Dimension of set (mm) | L | 2500 | |
W | 1050 | ||
H | 1500 | ||
Net weight of set (kg) | 1680 | ||
Other spare parts (1 piece) | Gallus Air filter element Diesel oil filter element Machinery oil Specification Special tool |
Production Line
1. Cold rolled steel plate for canopy
2. Most advanced Laser cutting system with most efficient work.
3.Most advanced bending equipments with most 0.3mm accurate size bending.
4.Welding
5.Delivery
1) Q: Can i have your quotation?
A: First, please offer us the information of your electric power capacity & basic voltage, frequency requirements,without these parameter, we are not able to recommend you the suitable machine
2) Q: Do you have overseas service?
A: No,but we normally help our customers to solve the problems through phone,Email, skype, internet video. high efficiency. We offer one year guaranteen, within one year, if component of the machine broken, we freely offer the component, but the delivery fee should be paide by client
3) Q: How about the payment term
A: T/T 30% deposit, 70% of balance paid before shipment