Beer brewery♦♦♦♦♦Beer distribution tanks are also called serving tanks, tax determination tanks or clear beer tanks (=CBTs), bright beer tanks (=BBTs) or maturation/storage or conditioning tanks. These tanks are used for the storage of the beer prior to being served or packaged. Depending on their application the beer serving tanks can be glycol jacketed or can be located in a walk-in cooler. For brewpubs serving is often done by pumping or pressurizing the beer toward the serving location.
♦♦♦♦♦The brew house system could be included two-vessels brew house, three-vessels brew house and four-vessels brew house. Two-vessels brew house includes mash/lauter tun and kettle/whirlpool tank. Three-vessels includes mash tank, lauter tun and kettle/whirlpool tank. Four-vessels includes mash tank, lauter tun, boiling kettle and whirlpool tank. The capacity is bigger, the vessels is more. It is just in order to reduce the brewing time, improve the working efficiency.
Conical fermentation tank with cooling jacket structure is dished head and cone bottom,with Polyurethane installation and dimple cooling jackets .There is a cooling jacket on tank cone section,columnar part has three cooling jackets.
Capacity/batch | 100L | 200L | 300L | 500L | 1000L |
Model | TS-100L | TS-200L | TS-300L | TS-500L | TS-1000L |
Area | 15M2 | 25M2 | 35M2 | 45M2 | 80M2 |
Power | 8kw | 12kw | 20kw | 35kw | 35/15kw |
Frementation cycle | 8~20days | 8~20days | 8~20days | 8~20days | 8~20days |
PRODUCT FEATURES:
1)Desiging tanks and heating system according to craft, mash tank warming≥10ºC/min
2)Energy saving stir structure : large cross-section impeller, 15r/min speed
3)Sieve plate of filter tank includes welding sieve plate and milling sieve plate.
4)Plow knife of filter tank separated to one foot, feet and bow plow knife
5)Wort boiling heat way includes steam jacket, interior heating and exterior heating.
6)Material includes stainless steel 304, 316 and red copper
FermenersMaterial: stainless steel 304, brushed outer shell*Dimple plate cooling jacket on tank body and conical bottom*Insulation: polyurethane, thickness: 80mm*Interior thickness: 3mm*Exterior thickness: 2mm*Temperature sensor TP100*Side manhole*Taper angle 60°*Inner tank mechanical polishing and out plate surface protection ribbon polished on welds*1pcs x breathing valve *1pcs x mechanical pressure regulation valve*1pcs x sample valve *1pcs x racking arm*1pcs x pressure gauge *1pcs x CIP spray device*1pcs x drain outlet bottom *1pcs x solenoid valve*4 heavy duty legs with leveling pad *Test pressure: 3barCooling systemPacking &shipping1)All tanks will be packed with soft protection material and mounted on steel frame
2)All accessories and spare parts will be packed with soft protect
Company information Successful project show
Our products sell all over the China and export to US ,Europ ,Canada ,Russia ,Norway ,Czech, Australia ,Germany , Poland , Brizal , India etc, more than 70countries and areas, and we have abtained many approvals and praise from them.
customer evaluation QUESTION:
1.Q:Are you a manufacturer?
A: Yes,we have been in providing the professional products in this field for 15 years.
2.Ask:how to install the machine ?
Answer:we can intrust the install the machine by vedio, email ,picture.....if large project , we can arrange the worker help you to install it in your country .
3.Q :How you pack the products ?
A: Normally as the export standard packaging or as you required.
4.Q: What is your available port of shipment?
A:Qingdao port,shanghai etc.
5.Q: Is customized available ?
A: Yes, according to your detailed drawings you provide
6.Q:Ask:how to install the machine ?
Answer:we can intrust the install the machine by vedio, email ,picture.....if large project , we can arrange the worker help you to install it in your country .
7.Q:After Sale Service
1. Warranty policy three years from shipment
2. We will send you the replacement after received the broken part
8.Q: Are you trading company or manufacturer ?
A: We are factory and welcome to visit us at any time.
9.Q: How long is your delivery time?
A: Generally single tanks need 20-30 days, for whole plant need 40-50days.
10.Q: Do you have CE and UL certification?
A: Yes.
11.Q: What is your terms of payment ?
A: 50% deposit and 50% before delivery.