INCINERATOR INFORMATIONS
Specifications
1)Heat Recovery System
2)Automatically controlled
3)Continuously and fully burning
4)Two combustion chambers
Main Characteristics and Scope of Application
WFS series of waste incinerator, produced by Shandong Better Environmental Protection Technology Co., Ltd, introduced the world's most advanced incinerator technology, and have developed independent intellectual property rights of the medical waste incineration processing equipment, which developed by our own technical experts and research organizations. The equipment is totally enclosed, small size, high efficiency of burning. It has reasonable process, high technology, and less hazardous. WFS series waste incinerator has wide applications such as hospitals, hotels, railway stations, large commercial institutions, enterprises and institutions.
Main features:
1. The use of gasification burning technology, can be applied to the burning of the waste which produced by hospitals, household, industries, etc.
2. By using of gasification incineration method, wastes generated every day can be incinerated once at a time.
3. The use of gasification burning, mixed-burning, and burn treatment technology, makes smoke and dust content lower than the state emission standards.
4. Totally enclosed operations, avoid secondary pollution.
5. Small size, small floor occupation.
6. Two kinds of this series of incinerator, the oil fuel and the gas fuel, user can select different type according to the need.
Technical Characteristics
What the WFS series Waste Incinerator used is the most advanced burning down technology, that is first burning, second burning, and burn treatment. The design of incinerator's combustion chamber use the gasified burning down technology to move the temperature in incinerator stove from 200°C to 400°C. Due to this technology, there will no melt block, slag lump and sintering problems in the burning down process. Gasification and direct-fired incinerators have very little dust generated during the process, compared with other kinds of heaters and stoves. There are second burning equipment and circle-wind generator installed in the second burning combustion chamber. Under the high temperature, the flammable gas can fully burn, and also mix and burn the gas generated in gasifier with the air under high efficiency, prevented the carbon material's transgression and late burn phenomena. Because of the combustion ways like tangential entering of gas and air are used, the gas can reburn fully in the combustion chamber. And at the same time use the circle airstream to remove the dust. The flue gas can stay in the combustion chamber more than for 2 seconds, so the combustible substances in flammable gas and flying ashes can be burn down completely. There are dry exhaust purification equipment fixed on the incinerator's upside, which supply the adsorption treatment of Hydrogen Chloride and Sulfur Oxides. And Ozone in the flue gas is decomposed under the high temperature. On the purpose of getting rid of the acidic gas and purifing the exhaust gas, flue gas purification system have filtration brick of Ca(OH)2, which react with acidic gas. And reduced the harmful ingredient in the to flue gas below country's"The Hazardous Wastes Burning Down Contamination Control Standard (GD18484-2001)".
Incinerator's operating control use the automatic program control system, which reduce worker's work intensity. The doors of combustion chamber and cleaning room use the Cluster-Type structure. Burning down process in the stove is isolated completely with outside to form the negative pressure combustion, and prevent the possibility of secondary pollution. This has great advantage in handling dangerous infectious medical waste.
WFS-30 Waste Incinerator
NO | Item | Spec. |
1 | Burning capacity | 20~30kg/time (3-6 times/day) |
2 | Incinerator size | 1.45m*0.9m*1.75m |
3 | Volume of incinerator | Gas room 0.3m³,Secondary burning room 0.2m³, Mixing combustion room 0.03m3 |
4 | Size of waste inlet hole | 480mm*600mm |
5 | Chimney | Height 5m,Outer diameter 280mm |
6 | Air blower | 0.37kw |
7 | Combustion burner | 0.11kw, fuel consumption 4-6kg/h |
8 | Re-combustion burner | 0.11kw, fuel consumption 6-10kg/h |
9 | Running-voltage | 220V or 380V |
10 | Weight | About 2300kg |
WFS-50 Waste Incinerator
NO | Item | Spec. |
1 | Burning capacity | 30~50kg/time, 3~6 times per day |
2 | Incinerator size | 1.8m*1.15m*3m |
3 | Volume of incinerator | Gas room 0.5m³,Secondary burning room 0.3m³, Mixing combustion room 0.04m3 |
4 | Size of waste inlet hole | 620mm*800mm |
5 | Chimney | Height 10m,Outer diameter 280mm |
6 | Air blower | 0.37kw |
7 | Combustion burner | 0.11kw, fuel consumption 4-10kg/h |
8 | Re-combustion burner | 0.11kw, fuel consumption 4-10kg/h |
9 | Running-voltage | 220V or 380V |
10 | Weight | About 4000kg |
WFS-150 Waste Incinerator
NO | Item | Spec. |
1 | Burning capacity | 100-150kg/time (3-6 times/day) |
2 | Incinerator size | 2m*1.4m*3.5m |
3 | Volume of incinerator | Gas room 1.4m³,Secondary burning room 0.7m³, Mixing combustion room 0.1m3 |
4 | Size of waste inlet hole | 760mm*960mm |
5 | Chimney | Height 10m,Outer diameter 300mm |
6 | Air blower | 0.5kw |
7 | Combustion burner | 0.11kw, fuel consumption 4-10kg/h |
8 | Re-combustion burner | 0.22kw, fuel consumption 7-14kg/h |
9 | Running-voltage | 220V or 380V |
10 | Weight | About 7000kg |
Note: also we can manufacture the other different capacity like 300kg/time, 500kg/time, etc.
FAQ
1.Q:Are you a factory or trading company
A: We are a factory, we have rich experience for manufacuring water processing equipment for more than 10 years.
2.Q:Where is your factory located? How can i visit there?
A: Our factory is located in No.3388 Zhencheng Road, Huangtu Town, Jiangyin City, Jiangsu Province,China. It is about 2 hours from Shanghai airport. We can pick you up if you need, welcome to visit our factory.
3.Q: Do you have minimum order quantity request?
A: No minimum order, but it can get a discount if you order a large quantity.
4.Q: Do you have certificates?
A: Yes, we have ISO,SGS certificate.
5.Q: Can you meet my special requirements for my products?
A: Yes, we have a professional design team. We can provide drawings according to your requirements.
6. Q:How to buy your idea products?
A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
7. Q:How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
8. Q:What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
9. Q: How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
10. Q: How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
11. Q: How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
12. Q:How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
Shandong Better Enviromental Protection Technology Co.,Ltd,
it is the largest environmental protection technology enterprise in Shandong Province, adopted the US technology,
with experience over 10 years on machinery, during the past decade, we won very good reputation among our customers all over the world, ,Turkey, Janpan, Saudi Arabia, Bangledesh, Iran, Iraq, Vietnam, Singapore, Maldives, Malaysia, Argentina, Comlombia, Ecuador, Mexico, Mongolia, UZ, etc, and got the National Patent for this product.
We are the sewage and waste treatment industry expert.
Hand in hand with BETTER, create a green homeland together!