China Nice Design Water Screw Chiller to Cool Plating Tank, Find details about China Screw Water Chiller, Screw Chillers from Nice Design Water Screw Chiller to Cool Plating Tank
Model No. | RHT -060WD | RHT -080WD | RHT -100WD | RHT -120WD | RHT -160WD | RHT -180WD | RHT -200WD | |
Power Supply | 3Φ-50Hz-380V | |||||||
Refrigeration Capacity | KW | 216 | 290 | 346 | 396 | 520 | 586 | 670 |
Kcal/h | 185760 | 249400 | 297560 | 340560 | 447200 | 503960 | 576200 | |
Power Consumption | kw | 41.0 | 55.8 | 66.5 | 76.2 | 102.5 | 113.0 | 130.3 |
Freezing Water Flow | m3/h | 35 | 48 | 58 | 65 | 90 | 98 | 115 |
Cooling Water Flow | m3/h | 43 | 59 | 70 | 80 | 106 | 122 | 138 |
Compressor | Type | Semi-hermetic screw type | ||||||
Qty | 2 | |||||||
Starting | Y- Δ | |||||||
Control | 0-100% (8-stage capacity control) | |||||||
Input(kw) | 22 x2 | 30 x2 | 36 x2 | 41 x2 | 56 x2 | 61 x2 | 70 x2 | |
Freezing Oil | Type | SUNISO 4GS | ||||||
Vol (L) | 7 x2 | 7 x2 | 7 x2 | 8 x2 | 12 x2 | 16 x2 | 16 x2 | |
Refrigerant | Type | Standard R-22 / Eco-friendly type R134a or R407c | ||||||
Control | Thermostatic Expansion Valve | |||||||
Vol (kg) | 17 x2 | 21 x2 | 26 x2 | 30 x2 | 40 x2 | 47 x2 | 53 x2 | |
Evaporator | Type | Shell and Tube Type | ||||||
Pipe Dia. | PT3" | PT4" | PT4" | PT5" | PT5" | PT6" | PT6" | |
Condenser | Type | Shell and Tube Type | ||||||
Pipe Dia. | PT3" x2 | PT3 x2" | PT3" x2 | PT4" x2 | PT4" x2 | PT4" x2 | PT4" x2 | |
Protection Devices | high/low pressure switch, freeze protection device, safety valve, overload protection device, coil overheat protector, temperature automatic protective switch and etc | |||||||
Size | L(mm) | 2900 | 3050 | 3050 | 3200 | 3200 | 3350 | 3350 |
W(mm) | 1100 | 1100 | 1150 | 1150 | 1200 | 1200 | 1300 | |
H(mm) | 1500 | 1500 | 1650 | 1650 | 1760 | 1760 | 1850 | |
Weight | KG | 1860 | 2000 | 2250 | 2550 | 3050 | 3300 | 3500 |
Applications
Be widely used in plastics, electroplating, electronics manufacturing, pharmaceutical chemicals, food processing, refrigeration and other industrial establishments and guesthouses, hotels, shopping malls, office buildings and other types of civil air-conditioning system.
Package & Shipping
Use standard export plywood case with forklift truck feet, easy to load and unload
5-7 days to finish the production after receiving the deposit
Shipping by LCL or FCL
After-sales service: