China OEM Alloy Steel Carbon Steel Parts Presion Forging/Manufacturer Stainless Steel Handrail Fittings 30 Degree Round Flange Base, Find details about China High Precision, Metal Stainless Steel Foundry from OEM Alloy Steel Carbon Steel Parts Presion Forging/Manufacturer Stainless Steel Handrail Fittings 30 Degree Round Flange Base
Product Specifications | |
Craft | Lost Wax Casting , Precision Casting , Investment casting , Dewaxing Casting , silica Sol Casting , Precision Die Casting , Sand Casting. |
Material | Stainless Steel(General SUS304,SUS316,1.4301),etc.,Stainless Iron(General 201,420,430),etc.,High/Middle/Low Garbon Steel(A3,Q235,45),etc.,Alloy Steel(General 20cr,20crme,20crnimo,40crmo,40crnimo,42cr,42crme,42crnimo)etc.,Brass(H59,H62,H75,H80),etc.,Red Copper,Bronze,White Copper and other materials,The above menu is for reference only, if you have special needs,please contact customer service staff. |
Process | Wax Injecting War repairing ,Tree Planting , Mucilage , dewaxing , investment , Shell Vibration , Polishing , etc... 48 Processes In TotaL. |
Post-processing | Ordinary Polishing , Mirror Polishing , Electrolytic Polishing , Brushed Finishing , Grinding , Heat Treatment , Finishing , Drilling and tapping , Plating,etc. |
Ordering Methods | We Can manufacture And Process According To Customer's Samples Or Dravings Designs;Meanwhile We Provide Some Ready Stock for Direct Order. |
Mold Lead Tine | Rush Order : 3-5 Davs . General Lead Time:7-10Days ( Peculiar Product Exception) |
Sample Lead Time | Urgent Sample : 3-5 days , General Lead Time : 5-7 Days ( Peculiar Product Exception ) |
Order Lead Time | Urgent Orders:10-15 Days , General Lead Time:15-20 Days ( Peculiar Product Exception ) |
Terms of Payment | The Mold wili Be made After 100% Payment Of The mold Fee , 50% Deposit Should Be Paid In Advance , The Balance Should Be Paid Before Shipment. |
Shipping Port | Shenzhen |
Tax & Freight | Price Quoted Without Freight&Tax included,For other requirements Please contact customer service staff |