IVC Dumbwaiter Elevator for Kitchen Restaurant Hotel 304 Stainless Steel Good Price

China IVC Dumbwaiter Elevator for Kitchen Restaurant Hotel 304 Stainless Steel Good Price, Find details about China Factory, Hotel Dumbwaiter from IVC Dumbwaiter Elevator for Kitchen Restaurant Hotel 304 Stainless Steel Good Price

Model NO.
IVC-D01
Control Mode
Signal Control
Position of Computer Room
up
Elevator Door
Manual Door
Door Knife
Single
Deceleration Device
With Deceleration Device
Attendant
With Attendant
Shaft
Concrete or Steel Structure
Door Panel
Stainless Steel
Trademark
IVC
Transport Package
Seaworthy Packages
Specification
EN81
Origin
China
HS Code
8428101090
Model NO.
IVC-D01
Control Mode
Signal Control
Position of Computer Room
up
Elevator Door
Manual Door
Door Knife
Single
Deceleration Device
With Deceleration Device
Attendant
With Attendant
Shaft
Concrete or Steel Structure
Door Panel
Stainless Steel
Trademark
IVC
Transport Package
Seaworthy Packages
Specification
EN81
Origin
China
HS Code
8428101090

Dumbwaiter Elevator / kitchen food elevator Supplier Widely used restaurant hotel

These elevators are widely applied to the htotels,restaurants,apartment buildings,banks,offce buildings,hospitals,maills,factories,libraries,labsand post offices,etc,for delivering such items as foods,dishware,daily necessities,money,documents,medicines,cargos,books,instruments and letters,etc.
Our products have been widely praised in the Far East, Middle East, South East Asia, Africa and also South America
IVC Dumbwaiter Elevator for Kitchen Restaurant Hotel 304 Stainless Steel Good PriceIVC Dumbwaiter Elevator for Kitchen Restaurant Hotel 304 Stainless Steel Good PriceIVC Dumbwaiter Elevator for Kitchen Restaurant Hotel 304 Stainless Steel Good PriceIVC Dumbwaiter Elevator for Kitchen Restaurant Hotel 304 Stainless Steel Good Price







Manufacturing & Packing
From the raw material getting into factory to finished products getting out to customers, IVC has a strict operation system to control each steps.

No rejected raw material will be accpeted!
When raw material comes to factory, QC department will check all the materials, once any fault items found, it will be returned to suppliers at once. Only qualified material will get into raw material warehouse.

Production management
Every week, production department will make the production plan and update the schedule of online products. There is daigital board in each workshop showing the production plan everyday. In this way, from workers to managers all clearly know which project is online now.
Every moring, managers will guide the workers to run for 15 minutes first to refresh. Then check the machines status before operation and check again after one day job.

Packing
All parts are packed in solid plywood boxes, which can stand long time sea shipping and fumigation free. For some important parts like control cabinet, door operator and motor, parts will be covered by a strong film first, with desiccant, before put into boxes.

Quality control
1) All raw materials will be checked before get into warehouse. And bulk electronic product do sampling inspection. All parts must have qualified certificate from suppliers. QC1 is responsible for this.
2) During production stage, QC2 will check commissioning for each elevator, escalator and moving walks.
3) After elevator and escalator finished, QC3 will test the match of elevator motor and control cabinet, and the running condition of escalator and moving walks.
4) After packed, QC4 will check package condition for each parts, and takes photo for further reference.
5) When delivery, QC5 will check if all parts packed in container to avoid any missing, and takes photo for further reference.


 

Packing And Delivery

The Packing:


The packing material will use PLY WOOD BOXES as an standard export packing


The Delivery Time:

Start to production after receive 30% advance deposit from bank
After the technical detail confirmed clear within 30 working days shipping
Port of loading China, Shanghai Port