China factory direct sales quality cheap car garage lift

China factory direct sales quality cheap car garage lift, Find details about China Lifts, Car Elevator from China factory direct sales quality cheap car garage lift

Control Mode
Signal Control
Position of Computer Room
up
Elevator Door
Center Opening Door
Door Knife
Single
Deceleration Device
With Deceleration Device
Attendant
With Attendant
Shaft
Concrete or Steel Structure
Door Panel
Painted, Stainless Steel
Position Indicator
DOT Matrix Display, LCD
Controller
Step As380 or Monarch Nice3000 New
Trademark
IVC
Transport Package
Seaworthy Packages
Specification
EN81-50/70
Origin
China
HS Code
8428101090
Control Mode
Signal Control
Position of Computer Room
up
Elevator Door
Center Opening Door
Door Knife
Single
Deceleration Device
With Deceleration Device
Attendant
With Attendant
Shaft
Concrete or Steel Structure
Door Panel
Painted, Stainless Steel
Position Indicator
DOT Matrix Display, LCD
Controller
Step As380 or Monarch Nice3000 New
Trademark
IVC
Transport Package
Seaworthy Packages
Specification
EN81-50/70
Origin
China
HS Code
8428101090

Description:

MACHINE ROOM CAR ELEVATOR
Less Space, More Intelligence
IVA machine roomless passenger elevator cancels the machine room, reduces total area of the elevator equipment and flexibility utilizes the effective space. It has the strange contemporary sense and the more beautiful construction outline.


China factory direct sales quality cheap car garage liftChina factory direct sales quality cheap car garage liftChina factory direct sales quality cheap car garage lift
China factory direct sales quality cheap car garage lift
China factory direct sales quality cheap car garage lift
China factory direct sales quality cheap car garage lift

Manufacturing & Packing
From the raw material getting into factory to finished products getting out to customers, IVC has a strict operation system to control each steps.

No rejected raw material will be accpeted!
When raw material comes to factory, QC department will check all the materials, once any fault items found, it will be returned to suppliers at once. Only qualified material will get into raw material warehouse.

Production management
Every week, production department will make the production plan and update the schedule of online products. There is daigital board in each workshop showing the production plan everyday. In this way, from workers to managers all clearly know which project is online now.
Every moring, managers will guide the workers to run for 15 minutes first to refresh. Then check the machines status before operation and check again after one day job.

Packing
All parts are packed in solid plywood boxes, which can stand long time sea shipping and fumigation free. For some important parts like control cabinet, door operator and motor, parts will be covered by a strong film first, with desiccant, before put into boxes.

Quality control
1) All raw materials will be checked before get into warehouse. And bulk electronic product do sampling inspection. All parts must have qualified certificate from suppliers. QC1 is responsible for this.
2) During production stage, QC2 will check commissioning for each elevator, escalator and moving walks.
3) After elevator and escalator finished, QC3 will test the match of elevator motor and control cabinet, and the running condition of escalator and moving walks.
4) After packed, QC4 will check package condition for each parts, and takes photo for further reference.
5) When delivery, QC5 will check if all parts packed in container to avoid any missing, and takes photo for further reference.

1. How to get fast reply for inquiry?  
Send complete information to us   

Basic Parameter
Duty Load(kg)Rated Speed (m/s)Rise (m)PowerFloorsStopsDoors
       

Hoistway Parameter
 

Hoistway Wide (mm)Hoistway Depth (mm)Pit Depth(mm)Over Height (mm)Machine Room
     

Decoration

Car PanelDoor Panel
  


Car Parameter

Car Size CWxCDXH (mm)OP x OPH (mm)
  
 

2. How to place order
1) confirm the elevator specification and drawing;
2) sign contract with IVC;
3) production arranged after contract confirmed and payment received;
4) after products finished, inform the customer about the delivery time and book ships;
5) arrange delivery and send documents to customer after shippment;
6) follow up with customer for after sale service.


3. What's your delivery time
Usually 30 days after the arrival of deposit, but urgent production is also avaible. As the biggest and best China elevator and escalator supplier in world, IVC has the ability to support your projects in various ways.

4. What's the product warranty
The warranty for elevators is 12 months after delivery.

5. Installation and commissioning
1) for installation, factory will provide complete set of installation manual.
2) for commissioning, factory can provide remote guiding.
3) for special projects, factory will send engineers to site to help installing.
4) for all our agents, IVC welcome you to send your technicians to our factory to get training. IVC will cover the accomodation and transportation in our city.


6. After sale problems
Please tell us the contract number or product serial number, factory can check the product records according to the code.
China factory direct sales quality cheap car garage liftChina factory direct sales quality cheap car garage lift