Metal Racking Powder Coating System

China Metal Racking Powder Coating System, Find details about China Coating, Coating System from Metal Racking Powder Coating System

Model NO.
powder coating system
Advantage
Easy to Assemble and Disassemble
Hanna Features
Excellent Durability and Reliability
Key
Minimum Maintenance Requirements
Trademark
HANNA
Transport Package
Choose According to Customer Needs
Specification
customized
Origin
China
HS Code
8424300000
Model NO.
powder coating system
Advantage
Easy to Assemble and Disassemble
Hanna Features
Excellent Durability and Reliability
Key
Minimum Maintenance Requirements
Trademark
HANNA
Transport Package
Choose According to Customer Needs
Specification
customized
Origin
China
HS Code
8424300000

Metal Racking Powder Coating System

Metal Racking Powder Coating System


A powder coating line type 
*Hanna manual conveyor system features:
1. Based on customer needs, provide the corresponding optimal design.
2. Fine workmanship to ensure the stability of the conveyor track.

* How to design an optimal solution?
1. Comprehensive analysis of customer cost budget and capacity requirements, select manual delivery mode.  
2. Delivery method: Manual.
3. Comprehensive analysis of workpiece weight, size, shape and other factors, select the ground rail mode and design the optimal running length.

B:powder coating system 
* The main advantages of the Hanna conveyor system:
1, Easy to assemble and disassemble
2, Maximum flexibility, allowing the creation of transport routes of different configurations
3, High quality production and assembly of each component
4, Excellent durability and reliability
5, Minimum maintenance requirements
6, Provides very flexible operation and simple management.
7, Easy to handle loading and unloading operations, provide solutions for cargo handling of any size and weight.

C:powder spraying line 
*Hanna manual conveyor system features:
1. Based on customer needs, provide the corresponding optimal design
2. Fine workmanship to ensure operational stability
* How to achieve fine workmanship, optimized design and stable operation?
1. The track material is forged or steel, which is firm and durable;
2. All sheet metal materials and shaped parts, all lasers are off the assembly line, the tolerance is less than 0.2 mm;
3. Welding in the mold to ensure that the flange is perpendicular to the four corners of the track;  
4. The entrance is treated with a knife angle, and the edge of the track is free of burrs; 
5. The seam is no stuck; 
6. Docking, lap jointing, turning range, etc., smooth processing; 

Metal Racking Powder Coating System

03 PRODUCTS APPLICATION 


Metal Racking Powder Coating System        
EquipmentApplication 
Pre-treatment SystemBetter powder coating of the work-piece. 
Powder Coating RoomSpraying on the surface of the work-piece.
Big CycloneAutomatic fast color change.
Transport SystemDelivery of work-pieces.
Curing OvenIt makes the powder attaching to the work-piece.
Heating SystemThe fuel can choose diesel oil,gas,electric etc.


04 OUR ADVANTAGE


OUR ADVANTAGE:
Pollution free operation,Safe to operate,Maximum recovery efficiency,Durability,Quick colour change.
Professional Design ,Professional Scheme ,Professional Installation.
1,Hanna intelligent gun, unique circuit board design, Complete solve the problem of workpiece powder grooves 
on the dead angle, groove with powder.
2,Hanna unique to the wind system which make the effective temperature difference control furnace t
emperature fluctuate 3 ºC, ensure that products without color difference,coating dose not fall off.
3,Hanna big cyclone recovery system powder recovery rate as high as99.2%,ensure no dust spillover.Unique 
fast color change powder supply center, change color only 10 to 15 minutes.

Service assurance:
1,Provide complete information, including equipment drawing, electrical circuit control chart and use 
maintenance instruction.
3,Equipment troubleshooting method.
4,Provide the list of consumables to assist customers in establishing a comprehensive equipment 
maintenance system.
5,After the equipment is delivered to the customer, our company will send professionals to track the 
customer equipment for 60 days.
6,If customer has a device failure in the process of using the device, our company will operate the device 
remotely through the computer network through the authorization given by the customer, and eliminate all 
equipment failure problems.
7,Any problems with the equipment, our company guarantees to give solutions within 12 hours.
8, The warranty period of the equipment is 2 years. In 2 years, spare parts will be provided free of charge for 
any problems caused by non-human factors
05 COMPANY INTRODUCTION


Metal Racking Powder Coating System
Since 1990,From simple manual spraying to automatic powder spraying system.
We can provide you with innovative, rational and economical solutions. We can support you with advanced 
technologies.Delivering the best powder coating equipments and turn-key solutions.
We've built thousands of optimal customized lines and systems for powder coating operations across China 
and around the world. 
Our continuous research on the field as well as our constantly developing techniques and innovative nature 
of our engineering dpt. enable our customers to catch up to the latest developments by modernizing their 
equipment partly or wholly, so as to improve performance, increase profits and maintain their 
competitiveness in the world of trade.
Our company has passed ISO9001 certification,CE certification, and has obtained more than 70 paten.



Metal Racking Powder Coating System
06 CUSTOMER VISIT 


Metal Racking Powder Coating System
07 ORDER PROCESS 
Metal Racking Powder Coating System

08 PACKAGE & SHIPPING 


Metal Racking Powder Coating System
09 FAQ

Are you a trader or a factory?
We are manufacturer and exporter.
Our own factory was found in 1990,Our export office was established in 2014.
What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric, gas, diesel or coal?
D.The size of your factory(length, width and height)?
How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee,  reasonably determines and divides the stages of design, 
    production, installation and commissioning, and formulates detailed progress plans for each stage,
    Strengthen the quality assurance system and quality protection measures of equipment 
    manufacturing department. 
C,We manning quality inspectors specially to control the processing quality of product strictly.
How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment. 
C,After the debugging, will provide complete training and track customer device usage.
How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment
   maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the
   customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the 
   device remotely through the computer network through the authorization given by the customer, and 
   eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.

Feel free to contact with us to get your design .