China Plastic Injection Mould for Auto Vehicle Trash Garbage Tray Can, Find details about China Car Wastebasket Mold, Car Garbage Bin Mould from Plastic Injection Mould for Auto Vehicle Trash Garbage Tray Can
Mould material | Plastic mould material: P20 steel, 718, 2738,H13, NAK80,2344,2343,S136,etc.... |
Fast mould design | can be within 1-3 working days after getting customer's drawings |
Lead time | Plastic moulds :3- 6 weeks after getting the mould desig n confirmation. |
Mould testing | All of the moulds can be well tested before the shipments. Videos for testing the moulds are available. |
Minimum order: | small orders can be accepted. |
Production capacity | 50 sets/month |
Port | shanghai |
Runner | Hot/cold |
Payment terms | L/C T/T Western Union Money Gram. |
Mould making service | OEM/ODM service available. |
After sales service | Available by our staff with more than 10 years of working experience in this field. |
Good packages | In strong wooden pallets to avoid any damages during the long transportation |
We have been engaged in this field for 15 years, we've served customers from the United States, the United Kingdom, Spain, Australia, Singapore, Russia and other countries. |
Professional Certification |
Quality control and technology improvement |
•ISOIS09001:2000 |
•SGS certificate |
•The complete quality control system. |
Precision durable mold. |
•3 CNC: Precision 0.005mm |
•1 Three dimension:1Precision 0.001mm |
•1 wire drive slowly: Precision 0.002mm |
•2 Mirror discharge: Precision 0.005mm |
100% Guaranteed Quality |
•100% tested(Not Just Batch Tested) |
•SOP standard production. |
•IQC(tested all in matical )-IPQC(tested first parts and prodcut)-FQC(tested finished parts)-OQC(Shipments) |
•10 professional quality control inspectors |
Competitive price and service |
•Delivery time: 2-3 Weeks after order |
•Provide new design for customers' requirements |
•Provide DFM Report,Moldflow,Mould Design,MPR,QC Report, Injection parameter sheet,Testing video. |
•Free provided sample. |
•10-20% cheaper than other competitors |
•Return the entire mould cost if you order 500,000pcs product. |
•Life-long guarantee period, which is much longer among this field. |