1.25MPa Double Drums 6ton/Hr Coal Boiler for Textile Industrial

China 1.25MPa Double Drums 6ton/Hr Coal Boiler for Textile Industrial, Find details about China 6t Coal Boiler, Szl 6 Ton Steam Boiler from 1.25MPa Double Drums 6ton/Hr Coal Boiler for Textile Industrial

Model NO.
SZL6/10-1.25-AII
Drum Placement
Horizontal Boiler
Pressure
Low Pressure
Manufacturing Level
A
Burning Style
Internal Firing Boiler
Usage
Industrial
Product Name
1.25MPa Double Drums 6t Coal Boiler for Pakistan
Certification
GB, ISO9001, Ce, as, GOST
Rated Steam Temperature
194/204
Feed Water Temperature
20 ~105
Experience
Over 20 Years
Steam Boiler Efficiency%
>80
Transporting Size
12000X3300X3540mm
Steam Boiler Largest Weight Ton
60
Painting
Anti-Corrossion
Voltage
Optional From 110V to 440V 1 or 3 Phase
Trademark
EPCB
Transport Package
International Standard
Specification
4~35t
Origin
China Shandong
HS Code
84021900
Model NO.
SZL6/10-1.25-AII
Drum Placement
Horizontal Boiler
Pressure
Low Pressure
Manufacturing Level
A
Burning Style
Internal Firing Boiler
Usage
Industrial
Product Name
1.25MPa Double Drums 6t Coal Boiler for Pakistan
Certification
GB, ISO9001, Ce, as, GOST
Rated Steam Temperature
194/204
Feed Water Temperature
20 ~105
Experience
Over 20 Years
Steam Boiler Efficiency%
>80
Transporting Size
12000X3300X3540mm
Steam Boiler Largest Weight Ton
60
Painting
Anti-Corrossion
Voltage
Optional From 110V to 440V 1 or 3 Phase
Trademark
EPCB
Transport Package
International Standard
Specification
4~35t
Origin
China Shandong
HS Code
84021900
Product Description

EPCB Coal Wood Fired Boiler High Efficiency for Sale for Rice Mill

1.25MPa Double Drums 6ton/Hr Coal Boiler for Textile Industrial
  1. According to the fuel combustion characteristics, EPCB optimizes the gap between water walls to increase the contact mode and contact time between the high-temperature flue gas and water walls, and the contact time between the flue gas and the heating surface is longer. The longer the heat exchange time between flue gas and water, the higher the fuel utilization.
  2. After helping you select the fuel, we will optimize the combustion system for you according to the characteristics of the fuel. When the air enters the system, it will be pre-heated, passing through the controllable air duct, the amount of air is more suitable, and the fuel and air are in full contact, and the combustion is more complete. The boiler system you own requires less fuel to produce the same amount of steam.
  3. Using the new Internet of Things technology, you can even combine the entire boiler system with a mobile phone, you can receive the real-time data of the system, and even realize intelligent control and alarm when there is a problem with the boiler system.
  4. Equipped with a straight tube economizer, a larger heating surface is designed to improve heat absorption efficiency, and the tail gas temperature can be reduced to 150 ºC.
  5. EPCB will optimize the sewage treatment system. The hot water discharged will not be directly discharged, but the heat in the sewage will be recovered. Further, achieve energy saving.
1.25MPa Double Drums 6ton/Hr Coal Boiler for Textile Industrial
Detailed Photos

1.25MPa Double Drums 6ton/Hr Coal Boiler for Textile Industrial

Product Parameters
Item/TypeDouble Drums Chain Grate Coal/Biomass Fired Steam Boiler
Rated capacity t/h4681012152025
Rated steam pressure MPa1.25/1.6/2.51.25/1.6/2.51.25/1.6/2.51.25/1.6/2.51.25/1.6/2.51.25/1.6/2.51.25/1.6/2.51.25/1.6/2.5
Rated steam temperature ºC194/204/226194/204/226194/204/226194/204/226194/204/226194/204/226194/204/226194/204/226
Feed water temperature ºC2020606060104104104
Boiler thermal efficiency %81.5481.681.882.282.582.582.883.7
Heating area m2Boiler body99.68155.5181.63233.6298316.7456625.3
Economizer69.76140.6183.1209.3209.3225242.4267.8
Fuel & consumption Fuel typeClass II Soft Coal, Biomass, Wood Chips, Wood Pellets,
 Rice Husk, Palm Kernel Shell, etc.
Coal kg/h350.99 526.10 699.75 870.43 1040.72 1300.90 1728.25 2137.08 
Biomass kg/h507.26 760.33 1011.29 1257.96 1504.06 1880.08 2497.69 3088.54 
Size of boiler largest  parts mmLength7500680069007900810093001150011500
Width28003200310034003100330033003300
Height35003500350035003500350035003500
Weight of largest
parts of boiler ton
30405545/3050/3052/3155/3456/37
Certifications

1.25MPa Double Drums 6ton/Hr Coal Boiler for Textile Industrial

 

Company Profile

EPCB boiler is a professional boiler manufacturer in China. It has been engaged in the professional research of industrial boilers for 68 years. It has a professional and excellent scientific research team, production team, and technical service team. The main products are coal-fired boilers, oil and gas-fired boilers, biomass boilers, electric boilers, and power station boilers. EPCB boiler has more than 15000 users in more than 130 countries and regions. EPCB boiler is highly praised by users for its energy-saving, environmental protection, helping users save money, and high-quality after-sales service. Our experienced energy engineers customize the boiler system according to your industry characteristics and the actual production process of the factory so that you and your enterprise can produce higher quality products at lower cost and make your enterprise more competitive.
1.25MPa Double Drums 6ton/Hr Coal Boiler for Textile Industrial

After Sales Service

Pre-sale Service

  1. Provide free boiler selection service to provide you with a more suitable boiler and improve your production.
  2. Free boiler operation cost calculation helps you calculate the boiler production and operation cost and save fuel cost.
  3. Design environmental protection scheme free of charge to ensure that the local environmental protection policy is met.
On-Sale Service
  1. Provide you with comprehensive and professional technical support, help you solve all boiler problems, and repair the boiler system for you.
  2. Provide you with online delivery service, and you can see your delivery in real-time.
  3. Provide you with production tracking service, and you can regularly understand your boiler production process.
  4. Provide you with installation and commissioning services, and you can quickly arrange for the factory to be put into operation.
After-sale Service
  1. 12 months from the date of bill of lading: if the equipment fails within the warranty period, we will provide warranty services for the products sold.
  2. During the warranty period, free warranty service (including some accessories) can be obtained for faults due to equipment quality or non-Party A's reasons
  3. Remote support: if the boiler has problems during use, remote technical support can be provided.
1.25MPa Double Drums 6ton/Hr Coal Boiler for Textile Industrial1.25MPa Double Drums 6ton/Hr Coal Boiler for Textile Industrial
FAQ

1. Can you buy a suitable boiler and boiler system?

  1. We have a 120000 square meter professional factory to ensure that your products are supplied timely and stably.
  2. EPCB has nearly 20 years of international market experience, exported to more than 130 countries, and has more than 1000 successful user experiences.
  3. All the boiler drawings provided by EPCB are designed for you according to your actual needs.

2. Can it be put into operation quickly and produce benefits?
  1. The average working experience of our scientific research team is more than 10 years. The research direction is how to make the boiler system more intelligent, more energy-saving, and the latest boiler system. The boiler system designed for you will save more than 10% of the fuel cost than the ordinary system.
  2. You are free to choose the installation guidance mode, both online and offline. Your boiler system can be put into use quickly so that the factory can create revenue for you faster.
  3. You can also save time and energy costs and do more meaningful things, such as finding more sales channels and opening up new markets.

3. Whether the boiler operates safely and stably?
  1. We will provide you with one week to solve the faults caused by the incorrect use of the boiler, and we will communicate with you about the use of the boiler every month. We will do online inspection for you every year. Avoid faults caused by improper operation of your boiler system.
  2. We have 68 years of boiler manufacturing experience. The scientific research team combines advanced intelligent technology to make your boiler system more energy-saving, safe and reliable.

4.What is the service life of your boiler?
  1. Generally, the design life of the boiler is 20 years, but if it is operated correctly and maintained well, the boiler can be used for 20-25 years.

1.25MPa Double Drums 6ton/Hr Coal Boiler for Textile Industrial