120sn- 350A Assembly for Wire Feeder

China 120sn-350A Assembly for Wire Feeder, Find details about China Welding Machine, Welding Accessories from 120sn-350A Assembly for Wire Feeder

Model NO.
120SN-350A
Origin
Changzhou Jiangsu China
HS Code
85159000
Model NO.
120SN-350A
Origin
Changzhou Jiangsu China
HS Code
85159000
 120sn-350A Assembly for Wire Feeder
120SN-350A Assembly for Wire Feeder
120sn-350A Assembly for Wire Feeder
120sn-350A Assembly for Wire Feeder

Changzhou Huarui Welding & Cutting Co., LTD

Since the establishment in 1985, we have become one of the biggest manufacturers of welding and
cutting equipment and accessories in China by modern manufacturing equipment and special
technology.
 We are specialized in manufacturing MIG, TIG, PLASMA, Welding Torches and Spare
parts. With Euro connector, Lincoln connector , Miller connector and Tweco connector, we can fit
different kinds of foreign equipments.

1.MIG Welding Torch
Binzel, Bernard, Tweco, Esab, Lincoln/Tregaskiss, Panasonic/OTC, MAXI, Kemppi, Fronius, Mechafin.
2.TIG Welding Torch
WP-24, WP-9,WP-17, WP-26, WP-20, WP-18, etc.
3.Plasma Cutting Torch
Trafimet, Cebora, Panasonic/Esab


120sn-350A Assembly for Wire Feeder
120sn-350A Assembly for Wire Feeder
FAQ
Q1: Can I get a samples to check the quality?
A:Sure,we can supply samples. For regular goods, the sample cost is different from the amount you want.
For our new products, there's a MOQ of the samples.
Q2: Can I put my logo on the boxes/cartons?
A: Yes, this can be made according to your requirements, but you should send us the trademark authorization
letter.

Q3: How can you guarantee your products quality ?
A: Huarui's each torch must pass the following tests before packing: Insulation resistance test, High voltage
test,
Air/Water flow test, Air/Water seal test.
If there are defective items, we usually credit to our customer or replace in the next shipment.
Q4: What's the order procedure?
A: Firstly, we discuss the details together by e-mail or TM. Then we issue you a PI for your confirmation or
Trade
Assurance Order Payment Link. You will be requested to do the pre-paid full payment before we go
into the
production. After we get the payment, we start to process the order. It usually takes 5-15days if we
don't have the
items in stock.