100kVA AC Inverter Welding Machine for Fuel Tank Shell Plate

China 100kVA AC Inverter Welding Machine for Fuel Tank Shell Plate, Find details about China AC Welder, Welding for Fuel Tank Cover Frame from 100kVA AC Inverter Welding Machine for Fuel Tank Shell Plate

Model NO.
DN-100-13006
Conductive Way
Both-Sided
Welding Spot Number
Multiple
Type
Special
Trademark
HERON
Transport Package
Wooden Case
Specification
CE, CCC, ISO9001, TUV
Origin
Guangzhou, China
HS Code
85152199
Model NO.
DN-100-13006
Conductive Way
Both-Sided
Welding Spot Number
Multiple
Type
Special
Trademark
HERON
Transport Package
Wooden Case
Specification
CE, CCC, ISO9001, TUV
Origin
Guangzhou, China
HS Code
85152199
100kVA AC Inverter Welding Machine for Fuel Tank Shell Plate

Factory profile
Founded in 1997. Heron own over 56,000 square meters property; developed MFDC welding system, Capacitor discharge welding system, three-phase DC welding system; single phase AC welding system; offer a complete range of standard resistance welding equipments; and customize automation resistance welding production system with fixture; pursue high welding technology researching and developing all the time.
 
Our productions apply to different field like: car body production line, automotive part production line, refrigerator compressor welding line, silver tip with copper welding system, hardware welding; home appliance manufacturer line etc ,supplying the high tech and energy saving welding equipment and integrate the working station.
 
Our production lines include: press welders; manual and robotic welding guns, seam welders, bench welders; rocker arm welders ,flash butt welders, multi gun auto welder with wire feeder; customized work station, clinch system with BTM Tog-L-Loc; automatic arc welding stations etc.


With ISO9001, CCC, CE certification.

 100kVA AC Inverter Welding Machine for Fuel Tank Shell Plate
100kVA AC Inverter Welding Machine for Fuel Tank Shell Plate


Our long-term clients100kVA AC Inverter Welding Machine for Fuel Tank Shell Plate


FAQ

1.What's the trade terms?
A: FOB, EX-Work, CRF

2.What's the payment term?
A: a. T/T 30% as deposit, 70% should be paid before delivery.
    b. L/C at sight

3. What's the delivery time?
A: 2-3 months after received 30% deposit.

4. What's the package way?
A: Wooden case

5. Which shipment port?
A: Guangzhou or Huangpu

6.How long is the guarantee?
A: For one year after customer received the machine. (It's not including the comsumables)