Automatic C Purlin Machine

China Automatic C Purlin Machine, Find details about China Tile Machine, Rolling Machine from Automatic C Purlin Machine

Model NO.
C Purlin machine
Trademark
Xiamen Liming
Transport Package
40gp*1
Specification
12T
Origin
Fujian, China(Mainland)
HS Code
8455221000
Model NO.
C Purlin machine
Trademark
Xiamen Liming
Transport Package
40gp*1
Specification
12T
Origin
Fujian, China(Mainland)
HS Code
8455221000

This Producing Process Sketch As Below Picture:

This Profile Drawing As Below Picture:


Automatic C Purlin Machine
Thickness: 0.6 - 1.0 mm BMT, 0.7mm for inspection
Feeding width: 151mm
ZINCALUME / COLOR min. AZ 70 Yield strength: G550

 
General Parameter
1ItemParameters
2Model NO.C75 TRUSS
3MaterialGalvanized steel
4Thickness0.6-1.0mm
5Yield StrengthG550
6Feed Width151mm
7Effective width151mm
8Roll Stages14stages
9Shafts Diameter75mm
10Main Motor Power15kw
11Hydraulic Group Power5.5kw
 Max Line speed of roll Former20-25m/min
13Electric StandardAccording to local voltage

 
 
Machine Components
A.   A hydraulic group is use to expand the de-coiler, move the coil car and lift the coil
Pump motor:3KW
Coil Inner-diameter: 500-510mm
Maximum coil outside diameter:   1200mm nominal
Taper wedge extend type (Note to fit for special hooks)
Load Capacity: Max. 5Tons
Coil Width Max. 600mm, can load three baby coils, 151mm*3
Retarding Motor to turn the coil, Motor: 7.5 KW
Up/Down stroke of Coil Car: Max. 350mm (Empty loading)
There should be some grooves on the car to allow packing strip go through
HYDRAULIC UNIT LOCATE OUTSIDE
Foundation feet for both Un-coiler and the rails of Coil-Car
Maintain arm on the top, to avoid coil becomes loose when stop to be packed
The arm to be driven by pneumatic cylinder, manual control
The air supplier should be offered by the user
Inter lock: The mail shaft running only when the coil car at the lowest position
Snubber arm, connect with resistor to control coil turning speed automatically
Linear guide rail fix on base frame. Hydraulic power to drive the frame for
alignment,three baby coils alignment one by one.

Automatic C Purlin Machine
Automatic C Purlin Machine

B.  Cold Rolling Mills
Entry guide device
Gear/Sprocket driving, 14-step to form; stands design
Rollers manufactured from Cr12+ heat treatment
Shaft Diameter=Φ75mm, Precision Machined
Main Motor=15KW, Frequency speed control,
Max. Line Speed of roll former: 20-25m/min

Automatic C Purlin MachineAutomatic C Purlin Machine
 
C.Hydraulic Cutting device
Stop to Cutting, Post Cut, and slug cut
Cutting tool material:  Cr12, Heat treatment
Pump motor =5.5KW


D. PLC Control System
Control the quantity & cutting length automatically
Combined with: PLC, Touch Screen (Siemens), Inverter(Schneider),
Encoder (Omron), etc
Cut-to-length tolerance≤±2 mm
Control Voltage 24V
Guarding cover around the cutting device



E.  PLC Control System
       Control the quantity & cutting length automatically;
       Combined with: PLC, Touch Screen, Inverter (SIEMENS),
       Encoder (Omron), REMOTE CONTROL etc

       Cut-to-length tolerance≤±2 mm
       Control Voltage 24V

Automatic C Purlin Machine

F.
 Safety guarding system
Complete line safety guarding
Equipped with interlock switch control, safety model in control system

The following pictures for your reference only
Automatic C Purlin Machine


 
 
Automatic C Purlin MachineAutomatic C Purlin Machine
 
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.

 
Terms Of Trade
1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.