China Easy Installation Mining Equipment Mining Separation Jigger Machine, Find details about China Jigging Mining Machine, Jigger from Easy Installation Mining Equipment Mining Separation Jigger Machine
II. BASIC PARAMETER
Model | Hutch | Diaphragm | Feeding Size | Amount of make-up water (m3/t) | Make-up water pressure | Capacity | Power | Dimensions | Weight (Kg) | ||
Shape | Area | Stroke (mm) | Frequency of Stroke | (mm) | (Mpa) | (t/h) | (kw) | (mm) | |||
(m2) | (r/min) | ||||||||||
JT0.57-1 | Trapezoid | 0.57 | 8.5-12 | 80-180 | <6 | 12 | ≥0.05 | 1.5-3 | 1.5 | 1550×780×1530 | 610 |
JT1-1 | Trapezoid | 1.04 | 1017 | <10 | 23 | 2.5-5 | 2.2 | 2270×1110×1890 | 900 | ||
JT2-2 | Rectangle | 2.28 | 1221 | <10 | 24 | 510 | 3 | 3225×1550×2050 | 1640 | ||
JT3-1 | Trapezoid | 3 | 1230 | 50-125 | <10 | 36 | 7.5-15 | 5.5 | 2745×2000×3030 | 3085 | |
JT4-2 | Rectangle | 4 | 25-57 | <25 | 48 | 820 | 7.5 | 4240×1990×2750 | 3098 | ||
JT4-2S | Rectangle | 4 | 25-57 | <25 | 48 | 820 | 4×2 | 4240×1990×2750 | 3500 | ||
JT5-2 | Trapezoid | 4.86 | 1230 | <10 | 36 | 1225 | 7.5 | 3600×2000×2600 | 4500 |
Remark : chose the suitable model refer to your capacity per hour and max feeding size.
III. PACKING AND SHIPPING
Way of Packing * FLC&LCL Export standard container 20/40 GP.
* Steel support & iron sheet sea- worthy package.
* Load: export software scientific loading work
Transportation * By sea freight.
* MSK/MSC/APL/EMC/WANHAI/KLINE
* Air delivery services
* We will remind you before boat arrives.
IV.OUR SERVICE
1.Rational and practical design according to customers' request proved.
2.Within warranty period,we provide free repair if quality problems emerge.
3.Engerneers are avaliable to service oversea to assemble and test the machine according to the contract.
4.Free training of the first batch of operater proved, any question or problem about the products can be answered via online support,phone calls or on-sit support 24 hours.
V. FAQ
In order to provide you with efficient & suitable quotation and assistance for you, could you kindly tell me the following information:
1) Working capacity(m3/h)
2) Which kind of material are you going to mining?
3) What is the distance from the mine place to the water source