China Roll Forming Standing Seam Roof Machine Metal Roofing Machines, Find details about China Stand Seaming Roof Panel Roll Forming Machine, Evolutioner Standing Seam Roofing Machines from Roll Forming Standing Seam Roof Machine Metal Roofing Machines
1.3Tons un-coiler | |
Description | There are different choices, please turn to the catalogue of un-coiler |
2.Entry bench & Manual Pre-shearing device | |
Function | Smart cut control, to cut off the end of the final piece of sheet only |
Shearing Thickness | Up to Max. 0.6mm (if thickness > 0.6mm, then hydraulic pre-shearing device or electric pre-shearing device instead ) |
3. The general machine parameter | |
Suitable roll forming material | Color steel sheet or galvanized steel sheet |
Thickness | 0.4mm-0.6mm |
Feeding width | 600mm |
Frame design | Wall-plate-frame-design /New-stand-frame-design |
Roll stages | 16 stages |
Material of forming roller | 45# steel, CNC lathes, Hard Chrome Coated |
Shafts Diameter | Φ75mm |
Main motor power | 7.5KW with reducer |
Max. Line speed of roll former | 15m/min (Higher speed is available, depends on the specification required by the buyer) |
Hydraulic group power | 4KW |
Material of cutting blade | Cr12, hear treatment |
Electric Standard | 380V /50Hz/3PH or as the customer's requirements |
Machine Dimensions | 7180mm×1550mm×1650mm |
Major Color of Machine Painted | RAL 5015 (Blue) or as per customer's requirements |
Electric Seaming Machine | One unit |
Hand Seaming Pincers | Two units |
4. PLC Control system | |
PLC | Siemens brand (ABB brand is available if required) |
Touch Screen | Siemens brand (ABB brand is available if required) |
Inverter | Schneider brand (ABB brand is available if required) |
Encoder | Omron brand |
5.Product rack | |
Description | un-powered, 3 units |
6. 40GP/HQ container and Disposal inside for standing seam machine | |
Brand New / Double-door / 40GP/HQ container, one unit | |
Electric Power source box, one unit | |
Lamps inside the container, 6 units | |
Fans, two units | |
Company logo outside the container (if required) | |
Generator excluded | |
6. Service after sell | |
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Installation: (1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly. | |
8. About us | |
Please visit the web site: liming2018.en.made-in-china.com for detailed information |
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.